Laserfiche WebLink
. <br /> 6. Grading Quantiry <br /> Site will be regraded so all impervious will to drain to the catch basins. A small <br /> amount Af flow fram the south east comer will continue to flow to the neighbor as <br /> it does now. <br /> Total grading quantity is: 607 c.y. cut/ 127 c.y. fill. This was calculated Tin-taTin <br /> using Eagle Point 99. <br /> The Seasonal Rating Checklist has a value of 60. This implies a construction <br /> season of Feb 1 to Nov 1. <br />