My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6424 BROADWAY 2018-01-02 MF Import
>
Address Records
>
BROADWAY
>
6424
>
6424 BROADWAY 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2021 1:45:45 PM
Creation date
1/24/2017 9:54:04 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
6424
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�c Public Works Department <br />D ;Utilities Division, 3200 Cedar Street <br />ST ESTIMATE SHEET Everett, Washington 98201 <br />J U N 1 6 1998 (425) 257-8800 <br />................................................. <br />Receipt # CITY & E V E R E T T Date Paid <br />--- En•gir:eeringlPublic Services <br />Cost of Work Order Work Order # <br />X Cost of Service Order 4,588.00 Service Order # 9779 <br />Contact Person Telephone # <br />Requested By Kirk Brooks Date of Request 6-8-98 <br />Property Owner (name) St. Vincent DePaul i <br />Charge Cost to (name if different than owner) <br />Address City Zip <br />Installation Location 64th & Broadway <br />Installation type/description/size/etc. 4" hot tap & fire service. Expose 8" in 64th, tap install control <br />valve and box, lay 30' (±) 4" DI pipe to customer stub. Remove DCDA and make final connection after <br />® The following estimate is based upon the Utilities Division providing all labor, equipment, materials, to <br />restoration, and final hook-up. <br />[1 The following estimate is based upon the Street Division work group providing all labor, equipment, materials <br />a� i restoration to property. <br />Please notifv the City of Everett Utilities Division 10 workin_z days in advance of required installation date <br />to allow for scheduling and parts procurement <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the property for which such installation was made and the owner <br />thereof, and provided further, that any excess payment shall be returned to the person applying for the installation. <br />'Deposit must be paid prior to ordering parts or scheduling work. <br />Labor Sc Benefits <br />Material <br />Equipment Rental <br />Surface Restoration <br />TOTAL <br />160.00 <br />1,590.00 <br />838.00 <br />'$4,588.00 <br />cc: Bldg. Permit Center <br />Clair Olivers <br />Tom Thetford <br />Kirk Brooks <br />Gordon Witcher <br />Dan Lowell <br />Stan Mitchell <br />Paul McKee <br />Gerry Crurn <br />Alan I peke <br />Prepared by: Gerrycrum ate Est. <br />Accepted by: /��% Prepared: Representing: <br />ESTIMATE GOOD FOR 6 MONTHS <br />OOAcsuL%JNJS ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.