My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6624 BROADWAY 2018-01-02 MF Import
>
Address Records
>
BROADWAY
>
6624
>
6624 BROADWAY 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2021 1:53:57 PM
Creation date
1/24/2017 10:06:06 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
6624
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV. Erosion and Sediment Control BMP's <br />Erosion and sediment control BMP's will be employed to limit the amount of sediment <br />leaving the site. The proposed ESC measures are shown in the Project TESC plan. The <br />relatively small site and the already built out surrounding area limit the number of BMP's <br />which are applicable to the project. Table 4.1 lists the BMP's proposed for the project. <br />Table 4.1: Pro osed Erosion Control BMPs <br />BMP Code <br />(per Stonnwater <br />Management <br />Manual) <br />BMP Title <br />E2.10 <br />Stabilized Construction Entrance <br />E3.10 <br />Silt Fence <br />E3.30 <br />Storm Drain Inlct Protection <br />Temporary Fencing <br />In accordance with Section 1-2.5, land disturbing activities should not be limited to <br />February 1 to November 1. The project is anticipated to begin mobilizing in late January <br />and should not be conducting significant construction activities until after the February 1 <br />limit. <br />V. Runoff Control BMPs (Treatment and Stream Bank Erosion <br />Control) <br />Hydroloey <br />Runoff flow rates from the site were calculated using the Santa Barbara Unit Hydrograph <br />Method as calculated using the Stormshed 2G ® software program. Inputs and <br />calculations are included in Appendix A, and are summarized in Table 5.1. Sec Figures 2 <br />and 3 in Appendix F for associated basin maps. <br />Table 5.1: Summary of Developed Hy <br />basin -Areas- Existing <br />I Total Area= .28 Ac. <br />Onsite <br />impervious Area= 0.08 Ac. <br />Onsite <br />Pervious Area= .20 Ac. <br />Soil Tyhc: <br />Calculated Runoff Flowrates <br />its and Cah <br />Developed <br />0.29 Ac. <br />0.18 Ac. <br />0.11 Ac. <br />Alderwood (Group C) <br />unmiti iatedJ <br />Habitat for Humanity- Monagan Mor Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.