Laserfiche WebLink
NWEC LOWRISE RESIDENTIAL COMPLIA�ICE CHECKLIST <br />REOUIXEDr E�eCi�IC9I <br />iz <br />s 3 storles, Zone <br />INSPECTION �MPORTANT: Pleaie supply Intormatlon requested In the approprlete <br />APPROVED <br />shaded boxes below. Dlarepard boxes that don't descrlbe your bulldinp or <br />�' equlpment. �QNQlpleca checks In the two lett columns. <br />0 <br />INSULATION PHASE <br />Walls((ncludinp rim �oists) will be insulated withoul compression to: �q <br />❑ R-79 batt (Chq6, options I,III,IV) ❑ R•24 (Ch N6,Optton II) bJ�� R-�L(Ch # 4 or 5) <br />Balow p rede wells not insulated on the exterior (See FOUNDATION PHASE) will be fnsulated to: <br />❑ R•19(Chapter 6, all Oplions) on the Interior ❑ R-_ (Chapters 4, 5, or 7) on the Interior. <br />V�ultad csif Inps will be insulated wNhout compressbn to: � <br />❑ R38(Ch #6, all options) 0 R_—(Ch #4 or 5) <br />❑ I I C] Skyllpht wall Insulatlon Is installed and equivalent to the requlred wall R-values <br />(Recommendation: place ceil(ng Insulation batts In place behind skylipht wells) <br />❑ Vapor raterdars will be Installed toward the wartn surtace as represented below: <br />Select one o tion for floors, walls, and appropriate ceilings: <br />Floors: � Plywood Iabeled EXPOSURE 1❑ Poty (z 4 Mil) ❑ backed betts ❑ PVA , <br />Walls: ❑ Poly plastic (z 4 Mil) ❑ backed batts ❑ PVA <br />Ceilings: ❑ Not required where ventilaiion space averages >12" above insulation. <br />Opo,� pw� ( 4� ❑ back�d pattt �j] PVA <br />❑ H�etinp �yitem efficlency and ilzlnp requlrements wili be met as represemed beiow: <br />Mezlmum heatina system capacity (150%of design heal load) has been calculated a[ �.-� KW <br />H�at Pump eHlclencywillbemetunderthefollowingcomplfancApath: <br />❑ Ch #6, Option IV: air source heat pump: HSPF 2 6.8 <br />❑ Ch #5 atr sourCe heat pump: HSPF 2 6.8, COP � 2.7/2.0 <br />❑ Ch #5 water source heat pump: COPa 3.0 <br />Heatlnp aystem requlrements wlll Is met with followlnp system: <br />Mfr. Model N Max. outpui K W <br />Tve• . HSPF COP <br />NWEC Insulatlon phase requlrements: <br />Approved by• <br />Date <br />WEEBAPpIL�O Page 6 oi 7 <br />