Laserfiche WebLink
2001 Washinaton Slate Nonresidenlial Energy Code Compliance Form <br />zoo, wasn�mno� <br />Project Info P�alectAOtlress 81i3 BROADNAY Date 1/13/2009 <br />��;.n. For Buibing Dept. Use <br />MA 98203 <br />App�ic it Name: sMcoE xvac, tne. <br />AppliwntAc'dwss� e�2a I1TH PLACE NE. LK 9TEVENB, wA 98358 <br />Applican�Ph7ne: �zs.soe.e9e� <br />Project Description I TWO TWINNED GAS FURNACES V`✓ITH 3.5-TON COILS; TWO 3.5-TON HEAT <br />Brienydescribe mechaniw� system SPLIT HEAT PUMPS; FRESH AIR AND RELIEF AIR HOODS WITH ECONOMIZER <br />type and reatures. FOR FURNACES; ONE IN-LINE EXHAUST FAN; SUPPLY, RETURN 8 EHAUST AIR <br />I DUCNJORK; GAS PIPING. <br />❑ Indudes Plans IlnGude documentation requinng compliance wdh commissioning requirements, Section 1416. <br />I QQ Simple System Q Complez Syslem � Syslems Analysis <br />Option �See Decision Flowchart (over) for qualifications. Use sepurale MECI I-SUM lor simple 8 complex systems ) <br />I Gqu ipment Schedules I The following information is required lo be incorporated with the mechaniwl equipment schedules on the I <br />plans. for projeCts without pla�s, fill in the required information below. <br />Fan G ui ment Schedtile <br />Equip. <br />ID 6rand Name' Model No.' CFM gp' HP/BHP Flow Control5 Location of Service <br />EF-1 FANTECN FGB%L JAU U.6^ i.4S 7f[�:PS TITfE CI.00R VTILITY ROR1 <br />'If available. � As tested according lo Table 14-1, 14-2 or 14-3. ' If required. ' COP, HSPF, Combustion Efficiency, or AFUE, as <br />appiicable. ' flow coMrol types: variable air volume(VAV), conslan[ volume (CV), or vanable speed (VS). <br />ZI <br />