My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8223 BROADWAY 2016-01-01 MF Import
>
Address Records
>
BROADWAY
>
8223
>
8223 BROADWAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2017 11:31:30 AM
Creation date
1/24/2017 10:43:02 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
8223
Notes
PREVIOUS 1932 MOUNTAIN VIEW LN
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hn� <br />O�� <br />C H <br />H�� <br />K n <br />OSO <br />'� M '{1 <br />yyH <br />�O� <br />OHd <br />��8 <br />pr f] <br />t' y z <br />yy <br />ge� <br />��� <br />H V� <br />H O v� <br />i �w <br />PUBLIC MURKS DEPRitiHENT <br />� UfILITIES DIVI�ION �'��* <br />3200 CEDAR STREET <br />EVERE7T, 1VASHING'1'ON <br />COST ESTINATE SHEET <br />Reo,uested by charles ThorPe Date of Request 3-ie-86 __ <br />Chaxge Cost to (Name) <br />P. O. Box "L377 Everett, WA yiP 98203 <br />Address — ' <br />Fund Utility ACC Progrem W•0. M Assigned_ _ <br />Installation Location Mountain view tane & so. adwy. <br />Installation type/description/size/etc. Hot tap 12" main and install fire hydrant. <br />Total Estimated Cost 52275.00 <br />This estimate reflects the Utilities Division having to <br />provide labor, equipment and materials to complete the <br />above mentioned installation including, but not limited <br />to, the items identified to the right. Any labor and/or <br />equipment provided by the contractor ta facilitate the <br />work by the City water department will be reflected in <br />a refund to the person making the deposit. <br />Saw cut ..............�_ <br />Shoring ............ x <br />Excavation ......... x <br />Backfill ........... x <br />Compaction ........... x <br />Temporary Patch .... • x <br />permanent Patch .... . x <br />Furnish double check valve assembly for <br />temporary water supply ................ <br />Final hook-up after purity and <br />pressure testing .......... _ <br />({Vhenever the estimated cost is not sufficient to cover the total expense for labor, <br />material, equipment rental and administrative costs, the deficit shall be charged to <br />the property for which such installation was made and the owner thereof, and provided <br />further, that any excess payment shall be returned to the person applying for the <br />installation.) <br />Itemized Cost Estimate: , <br />(�t� /� <br />�.1s� Labor 4 Overhead 635.00 ���t /�� � 259-8821 <br />Material 1433.0o Estimate Prepared dy oon taahl Phone N <br />EquipmenY Rental 207.00 <br />Surface Restoration -o- <br />TOTAL ESTIMATE _ 2275.00 <br />��n��' �� <br />r,' ��I� ,S 0 1986 <br />_.. _ ._............._. <br />CIfY 0� EVERETT <br />P^°"c Werks Dept. <br />cc: Larry Callahan <br />Don IVcitkamp <br />Lain•y Crawford <br />Bob Chervenell <br />Clair Olivera <br />��. -�/'�/s� <br />7�-� `�� :�. ' S � o�' <br />
The URL can be used to link to this page
Your browser does not support the video tag.