Laserfiche WebLink
3 <br />CLOSED CM WORR ORDERS REPORT <br />Total Utility Maintenance Nfanagement System page_1__ <br />12/22%1997 <br />Date Range :O1/09/1989 - 12/2zI1997 <br />CM Work Order Range :087.0800810000 - LiT2830-30-322Pa�tern :,�,101196751302 <br />Item Range :<Blank> - ��3694L05 ____________________ <br />Program ALL Function ALL ---Activity �L______________________ <br />CM WORK ORDER ID: 7101196751302 Title: REPAIR 903 BROADWAY <br />«DUPLICATE PRINTING OFWATER SERVICEDER» <br />Item ID: WS1795D011 - __ Activity 675 <br />Location ID: Functi.on 119 <br />Program 710 <br />Date Completed: 12/01/1997 <br />Overall Craft: <br />Isaued: 12/O1/1997 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID ___ <br />WST JSM <br />WST TDE1 <br />SUPl �� <br />Issued by: WMW Assigned to: <br />Travel Time: 0.00 Hr. <br />Priority: <br />Name ________ <br />JEX, STERLING M. JR. <br />THOMPSON, DWAYNE E. <br />WARD, MICHAEL W. <br />Materiale: <br />ID <br />ADAP34000647 <br />ADAP34145347 <br />ADAP36001047 <br />CORP36002347 <br />COUP34101847 <br />COUP34142747 <br />COUP36006547 <br />PIPE36060747 <br />SADD50019447 <br />Planned Hrs Actual Hrs <br />-------- <br />0.00 <br />2.00 <br />0.00 2.50 <br />0.00 2.50 <br />Description _________ <br />ADAPTER 3/4" FIP X INSTA-TITE� <br />ADAPTER 3/4"MIP X 1"IPS INSTAO <br />ADAPTER 1" CST X INSTA-TZTE @ <br />CORP STOP 1" CCT X COP <br />COUPLING 3/4" THREADED BRASS " <br />COUPLING 1/41/4TBENDMCOPPERPT@ <br />PIPE 1" POLY I.P.S. <br />SERVICE SADDLE 12" W/1" CCT <br />Total Labor Cost: <br />Date <br />12/O1/1997 <br />12/O1/1997 <br />12/Ol/1997 <br />12/O1/1997 <br />12/O1/1997 <br />12/al/1997 <br />12/O1/1997 <br />12/O1/1997 <br />l2/O1/1997 <br /># Used <br />-------1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4 <br />1 <br />Total Material Cost: <br />Vehiclee: Hours Cost <br />ID Description __ ---------- <br />----------- 14.75 <br />--------------- 2.50 <br />---- <br />------- <br />VJ0026 '97 FORD 1 TON SVC TRU __________ <br />Total Vehicle Cost: 14.75 <br />Total cost for work order 7101196751302: <br />-•--_....._...,.....,-- ........_.._.._..«-,,._ <br />_ ..,.._... _. .., .. . <br />Cost <br />43 32 <br />47.88 <br />_____56_40 <br />147.60 <br />Cost <br />------7.71 <br />10.62 <br />13.35 <br />12.96 <br />1.06 <br />4.08 <br />9.85 <br />1.40 <br />22.42 <br />83.45 <br />245.80 <br />