Laserfiche WebLink
everett <br />� <br />INSPECTION REPORT <br />�•• - : •..e r <br />. . �► �� , <br />• � � ��:^_ —. . • • <br />�. - � ► <br />TYPE OF INSPECTION htEQUESTED <br />❑ BLDG: Pmt. �Vo. �MECH: Pmt No. oZ/�� <br />❑ ELEC: Pmt. No. ❑ PLBG: Pmt. No. <br />❑ Temp. Elect. ❑ Framing a'�Gas Piping <br />❑ Footing p Drywall, Nailing ❑ Consultation <br />O Foundation ❑ Shear Nailing ❑ Groundwork <br />C' Guctwork ❑ Grid O Struct Slab <br />❑ oVood Stove ❑ Rough•In ❑ F�nal <br />� Masonry ❑ Service ❑ <br />❑ APPROVAL ❑ PA4TIAL APPROVAL <br />❑ VIOLATION �CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contacl inspector and arrange for appointment. <br />❑ Was not able to periorm inspeclion. <br />� CALL ? 9•8&10 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />TH� PREMIStS PRIOR TO OCCUPANCY. <br />� <br />Inspector <br />Dafe � <br />