Laserfiche WebLink
rn �O5ZING Auo o a �ss� <br />CLOBED CM 1fOAR ORDERB REPORT <br />Total Utility Maintenance Management System page 1 <br />04/02/1997 <br />______________�__�_________________________________________________-_________--- <br />Date kange :01/09/1989 - 03/31/1997 <br />CM Work Order Range :1001091070001 - 7401196770910Pa��eTn :*101196649256 <br />Item Ranqe :<Slank> - W�/L3694L05 <br />Proqram ALL Function ALL Activity ALL <br />___�___________________________ _____- <br />------ <br />CM WORK URDER ID: 7101196649256 Title: SO .75 INCH 716 BRUSRRUD RD <br />« DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: -- <br />Location ID: '- Activity 664 <br />Proqram 710 Funr.tion 119 <br />Date Completed: 03/14/1997 <br />Overal? Craft: <br />Issued: 02/25/1997 <br />out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labort <br />Craft ID <br />UL CSG <br />WST TDE1 <br />WST WDT <br />SUPl WMP1 <br />UL WTE <br />Nat�rial�t <br />ID <br />ADAP34000547 <br />ADAP34000547 <br />BOX000056247 <br />CORP34001847 <br />COUP34142747 <br />METE36089447 <br />N/A <br />N/l. <br />N/A <br />N/A <br />PIPE34060647 <br />SADD42015447 <br />SETT34033647 <br />Vehiales: <br />ID <br />V2042 <br />Issued by: WMW Assiqned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name <br />CAVANAH, SHANE G. <br />THOMPSON, DWAYNE E. <br />WALDEN, DAROLD T. <br />WARD� MICHAEL W. <br />WESTVANG� TERRY E. <br />� <br />Actual Hrs <br />Planned Hrs Cost <br />------- -- ••------ <br />0.00 188.72 <br />0.00 268.10 <br />0.00 126.54 <br />0.00 45.12 <br />0.00 94.68 <br />Total Labor Cost: Y 723.16 <br />Description <br />------------------------------ <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />BOX METER PLA 15" X 10" W/LID <br />CORP STOP 3/r" CCT X INSTA @ <br />COUPLING 3/4" CTS COMP X MIPT@ <br />METER 5/0" X 3/4" NEPTUNE T-10 <br />TOP COARSE <br />COLD MIX (1/2 YARD) <br />DUMP FEE (ASSOC) <br />C.D.F. (ASSOC) <br />PIP� 3/4" POLY I.P.S. <br />SERVICE SADDLE 4" W/3/4" CCT <br />SETTER COP 5/8" X 3/4" (H12") <br />Description <br />------------------------------ <br />88 GMC 5-15 <br />14.00 <br />14.00 <br />6.00 <br />2.00 <br />6.00 <br />Date # Used Cost <br />-------- -------- ---------- <br />03/13/1997 1 8.36 <br />03/13/1997 1 8.36 <br />03/13;1997 1 12.89 <br />03/13/1997 1 15.10 <br />03/13/1997 1 4.08 <br />03/13/1997 1 30.67 <br />��� 27.76 <br />03/13/1997 1 25.00 <br />03/17/1997 1 24.87 <br />03 18 19 10 .90 <br />3/13/1997 47 10.81 <br />03/13/1997 1 9.48 <br />Q3/13/1997 1 _____51_91 <br />Total Material Cost: 337.19 <br />Hours Cost I 5 I.�� <br />------ ---------- <br />2.00 10.00 <br />