Laserfiche WebLink
J <br />CIASED CM WORK ORDERS REPORT <br />City of Everett Total Utility Maintenance Management Syetem <br />03/22/1994 Page 1 <br />sacsas�v�e��s���svve�vs�sas:�s�v��sv:s:ses:sssaa�aa�s��assass�a�sasaasvv�a�zvsav <br />pate Range :03/O1/1992 - 03/17/1994 <br />CM Work Order Ranqe :<Blank> - 8405421080229 Pattern :7401196750793 <br />):tem Range :<Blank> - WW22020001 Pattern :* <br />Pzogram ALL Function ALL Activity ALL <br />ettas��saa�s��s����iass�ss����a�s���sa�s���ss�vas��v�sssemssv�sa¢�aa�asessasmsss <br />t?! WORR ORDER ID: 7401196750793 Title: CONVERT 3019 HURL PL <br /><:<DUPLICATE PRINTING OF THIS WORK ORDER» <br />Ttem ID: WS0885T044 -- WATER SERVICE <br />Location ID: -- <br />Proqram 740 Function 119 Activity 675 <br />Date Completed: 03/15/1994 <br />c)verall Craft: <br />::ssued: 03/11/1994 <br />Uut of Service7 NO <br />!leter Readinq: <br />I)owntima: 0 hours <br />:;tatus: <br />Labor: <br />Craft ID <br />WST MKC <br />WST SRJ <br />Materials: <br />ID <br />AD71P34000347 <br />)1D)1P34000547 <br />BOX000056247 <br />COUP34004367 <br />METE36089447 <br />PIPE34060647 <br />SETT34033647 <br />Vehiclas: <br />ID <br />V2117 <br />Issued by: SKL Aesigned to: <br />Priority: Tr.avel Time: 0.00 Hr. <br />Name <br />------------------------------ <br />MOORE, KIM C. <br />STENSETN, ROBERT J. <br />Dascription <br />------------------------------ <br />1►D7IPTER 3/4" CST X IN3TA-TITE@ <br />1►Dl►PTER 3/4" MIP X INSTA-TITE@ <br />BOX METER PLA 15" X 30" W/LID <br />COUPLING 3/4" MIP X COP ELL @ <br />![ETER 5/8" • NO REMOTE RE7IDER <br />PIPE 3/4" POLY I.P.S. <br />SETTER COP 5/8" X 3/4n LGTH15" <br />Deacription <br />------------------------------ <br />CHEV 1 TON �91 <br />work Description: <br />METER/ 11376 <br />Total cost for work order 7401196750793: <br />Planned Hra Ac;:ual Hra <br />0.00 4.00 <br />0.00 4.00 <br />Total Lttbor Cost: <br />Data <br />03/15/1994 <br />03/15/1994 <br />03/15/1994 <br />03/15/1994 <br />03/15/1994 <br />03/15/1994 <br />03/15/If�94 <br />Total Iiatarinl Cost: <br />Dat� Hovrs <br />-------- ------ <br />0]/15/1.994 4.00 <br />Total V�hicle Cost: <br />Cost <br />78.92 <br />78.36 <br />157.28 <br />Cost <br />----e.oz <br />16.22 <br />12.34 <br />3.50 <br />27.21 <br />0.50 <br />47.78 <br />115.57 <br />Cost <br />-_--_23.20 <br />_-__-23 20 <br />296.05 <br />