Laserfiche WebLink
28b 20'/: <br />?8c 18%z <br />29-40 Dcleted <br />A concretc pile cap was poured around thc ncw piles and thc house was rcsted on thc new <br />foundation. Thc gnragc slab wns placcd at 5 inch thic4n�ss. Onc laycr of rcint'orccmcnt <br />was dcictcd from the slab. 1'hc rcmaininF layer was ins .Iled at center of slab and spaced <br />per thc plan. Thc pilc caps nt thc columns ��:rc installed as 3'x3' squurc �chich was <br />largcr than the surfacc arca of thc plan dctail. <br />All work inspectcd was done per the plans und spccifications, no variations, other than <br />notcd nbovc, �vcrc donc. <br />).. <br />_ .q; C � � j;r,;.,r�Z � <br />Jo)ih t�. Viccntc, r.r:. <br />�' Src fxhibit A, Pilc I.ayout sheet for locntion of piles <br />Pugc 2 of 2 <br />�� <br />