Laserfiche WebLink
C <br />PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard #601. <br />(.6 �j Connect side sewer per Cfty Standard #'s 601, �02, 604. <br />7. Connect all rooftop downspouts to the side sewer. <br />8. Connect rooftop downspouts to the drafnage system provided for th(s lot. <br />/ 9. JRooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />`--.-f Stortn Manual 3-2.6.2. Width �' , Depth .�._5; Length 33 . <br />10. The contractor must meet with the Public Works Inspector to discuss potentfal drainage <br />rouNng prior to beginning the project. <br />11 /install erosion control measures as detertnined by the Public Works inspector, such as silt <br />fence, slraw bales, swales, or erosion blankets. <br />12. Install erosion control measures per City of Everett Slandards for small parcels <br />13,,�temove erosion control measures upon completion of the project prior to final approval of the <br />permit. <br />�All excavated material from foundation, sidewalk and driveways shall be hauled to an <br />approved, pertnitted site. No wasting of materfal is allowed on this buildfng lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). ' <br />16. Install a Type I cencrete driveway per City of Everett Standard #307. <br />17. P�we driveway irom the front property line out to the street paving. <br />18. Contact the Water District (or connecting provisions for this building's <br />water and sewer services. <br />19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan ti410 is <br />required for the parking area. <br />20. If a sewer pump system is to be installed, the pressure Iine must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />21 A sprinkler system is required for this building in compliance wilh the requirements of NFDA <br />Standards 13D. <br />PWCommenb �r/ <br />