Laserfiche WebLink
ELECTRICAL <br />[]Temp Service <br />❑ Groundwork <br />❑ SlabiCondun <br />❑ Rough In <br />❑ Service <br />❑ Grounding <br />❑ Ceiling Grid <br />❑ Electrical Final <br />SITE WORK <br />❑ Fooling drains <br />❑ Roof drams <br />INSPECTION REPORT <br />Date _ L I v !�_Per�m( I <br />Contractor., tool\ <br />��t�3_oo2 <br />TYPE OF INSPECTION REQUESTED <br />BUILDING <br />MECHANICAL <br />❑LIFER ground <br />❑ Groundwork/Slab <br />❑ Footing <br />❑ Rough In <br />❑ Foundation <br />❑ Cmlmg Grid <br />❑ Structural Slab <br />❑ OK to msutate <br />(] Framing <br />❑ Rooftop Units <br />(J Insulation <br />❑ Mechanical Final <br />❑ Drywall Nailing <br />❑ Shoat Nailing <br />GAS PIPE <br />❑ Roof Nailing <br />❑ Rough IruSemcu <br />❑Ceding Grid <br />❑ Refrigeration <br />❑ Building Final <br />❑ Gas Pipe Final <br />OTHER OR CONSULTATION <br />PLUMBING <br />❑ GroundworklSlab <br />❑ Rough in <br />[] Ceding Grid <br />❑ OK to insulate <br />❑ Water Service <br />❑ k.I Gas <br />❑ Plumbing Final <br />Hot Water Tank <br />❑ Rough in <br />Q HWT Final <br />(APPROVAL ❑ PARTIAI APPROVAL FINAL APPROVAL THIS PERMIT <br />OK FOR TC O C] CORRECTICN REOULSILU <br />] OK FOR C O ❑ VIOLATION <br />] UNABLE TO PERFORM INSPECTION <br />1 CALL (425) 257•e8e1 FOR REINSPECTION 74 hour notice required <br />tiAktu(j iis till A"WAWG <br />Inspector: Ano'2 <br />Eon 110%) <br />Date: <br />_ <br />DATAIIARANC <br />