My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1010 N BROADWAY STARBUCKS 2018-01-02 MF Import
>
Address Records
>
N BROADWAY
>
1010
>
STARBUCKS
>
1010 N BROADWAY STARBUCKS 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 4:09:49 PM
Creation date
1/24/2017 12:08:37 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
1010
Tenant Name
STARBUCKS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Yu @TIROCHAt4uos, JOB TITLE:(,. Starbucks <br />p,,,e STRUCTURAL JOB NO.: 14006 <br />Structural Engineers OBSERVATION LOCATION: Everett, WA <br />REPORT DATE: August 1, 2014 <br />12011 NE 1•. St. Ste 306 <br />Bellevue, WA 98005 <br />A site visit was made at 1.30 PM July 31, 2014 to observe the general construction status of the project The <br />weather was clear and sunny. I was accompanied by Jeff Martin, Field Superintendent for Wilcox <br />Construction. <br />The followings are my observation: <br />• Building interior slab on grade were tasted with slab joint in place. <br />• All the perimeter wall studs were installed, and is in the process of installing the exterior OSB wall <br />sheathing. <br />• All shearwalls were installed, holdowns were observed to be in place. <br />• HSS posts for the canopy support were installed, straps at the top of the post were fastened to the roof <br />diaphragm. <br />• The roof truss are in place, roof sheathing are installed, except the last bay at the East and West ends <br />were not secured. Jeff indicated that the roof diaphragm will be fastened after z-clip for the blocking <br />is installed. <br />In general, work appears to be in good progress and meet the intent of the design. <br />L� <br />This report summarizes general observations made on site. It does not represent inspection or approval of the <br />contractor's work. The special inspection/testing agency is responsible for inspection of the work and testing <br />COPIES To File BY: <br />Helen Wong, DLR Group <br />
The URL can be used to link to this page
Your browser does not support the video tag.