My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1010 N BROADWAY STARBUCKS 2018-01-02 MF Import
>
Address Records
>
N BROADWAY
>
1010
>
STARBUCKS
>
1010 N BROADWAY STARBUCKS 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 4:09:49 PM
Creation date
1/24/2017 12:08:37 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
1010
Tenant Name
STARBUCKS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State En1♦Code Compliance Forms for Commemal. GrouW, and > 3 story R2 and R3 <br />Compliance Forms for Commercial. Grouo R1and s 3 stay <br />Project Info <br />Project Address StarbucksCoffee Company <br />Date 6/3/2013 <br />1010 N. Broadway r or Building Dept Use <br />Everett, WA 98201 <br />Applicant Name. Rensch Enginenring <br />Applicant Address I i I Ave C Suite 104, Snohomish, WA 98290 <br />Applicant Phone 360-863-6677 <br />Project Description <br />Briefly describe mechanical <br />system type and features <br />❑' incudes Plans <br />HEATING AND COOLING 15 PROVIDED BY 2 6-TON ROOFTOP PACKAGED UNITS <br />UTILIZING GAS HEAT AND DX/ECONOMIZER COOLING, FULL ECONOMIZER OPERATION <br />15 PROIVIDED WITH BAROMETRIC RELIEF. SEE PLAN SHEETS M001, M1101, M1102, AND <br />M5001 FOR DETAILS. <br />Drawings must contain notes requiring compliance win commissioning provisions per Section C408 <br />Compliance Option <br />0Smp'esystem Call' Complex System OSyslemsA 'Isis <br />IiquiptnenlSchedules <br />The followng inform Ilion is requ red to be i ¢orporaled wlh the mechanical equipment schedules on <br />the plans. For projects wlhoutplans, III m[tie iequred nformauonbelow <br />Cooling Equipment Schedule <br />Equip. <br />ID <br />Equip <br />Type <br />Brand Name' <br />Model No' <br />Capacilj <br />Blunt <br />OSA CFM <br />at Eeono7 <br />SEER <br />at EER <br />IPLV' <br />Econmizer <br />Option or <br />Exceptions <br />Heat <br />Recovery <br />YIN <br />RTu-1 <br />rnn <br />nw+t: <br />TR007223L <br />72000 <br />240D <br />13 <br />FULL ECONN <br />RT0-2 <br />PKG <br />Truu¢ <br />101C072M <br />72000 <br />2400 <br />13 <br />IMML ECONN <br />Heating Equipment Schedule <br />Equip <br />ID <br />Equp <br />Type <br />Brand Name' <br />Model No.' <br />Capably' <br />Btwh <br />OSA cfm <br />at Econo7 <br />Input Bull <br />Output Btuh <br />EKciency' <br />Heal <br />Recovery <br />YIN <br />RTu-1 <br />Par: <br />TRA11E <br />Txc07263L <br />N/A <br />24000 <br />80000 <br />64000 <br />80 <br />N <br />RTu-2 <br />PKO <br />TRANS <br />TRC072XIL <br />N/A <br />24000 <br />60000 <br />64000 <br />e0 <br />N <br />Pan Equipment Schedule <br />Equp <br />to <br />Equip <br />I Type <br />Brand Name' <br />Model No' <br />t,F N1 <br />SP' <br />MPIBHP <br />Flow Controls <br />Location of Service <br />zr-1 <br />ROOFTOP <br />OPEMNECK <br />G-70-o <br />260 <br />0.26 <br />1/30 HP <br />ry <br />Rooll <br />Er-2 <br />900"01, <br />ORRENNECK <br />cut-oas-n <br />210 <br />0.50 <br />1/20 HP <br />N <br />ROOFTOP <br />Service Water Heating Equipment Schedule <br />Equip. <br />ID <br />Equip <br />Type <br />Brand Name' <br />Model No.' <br />Input <br />Capacity <br />Sub - <br />Category <br />EF' <br />Location of Service <br />R0121 <br />TANK <br />AO SMITH <br />GCV-60 <br />40000 <br />0.58 <br />Above MP sin <br />' It available. I As tested according to Table C403.2.3(1)A third C403 2 3(8) 3 if required. s COP, HSPF, Combustion Efficiency. or AF UE, as <br />applicable. 5 Flow control types: variable air volume (VAV). constant volume (CV), or variable speed (VS). 11 Economizer exception number per <br />
The URL can be used to link to this page
Your browser does not support the video tag.