My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
820 N BROADWAY BASE FILE 2016-01-01 MF Import
>
Address Records
>
N BROADWAY
>
820
>
BASE FILE
>
820 N BROADWAY BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 8:38:15 PM
Creation date
1/24/2017 12:32:24 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
820
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � <br />; PUBL/L iVOR/C5 <br />September 27, 2013 <br />NSs. Debbie Bauers <br />CM Heating Inc. <br />1415 Broadway <br />Everett, WA 9201 <br />Project: Faith Tabernacle Church <br />]ob Address: 820 N Broadway <br />Plan Review: M1309-069 <br />Sentviae-mail ' <br />�,�ti� / 13� <br />—.-._� <br />Dear Ms. Bauer, <br />In response to the application for a mechanical construction permit, plans have been examined and we advise <br />that this is an incomplete submittal. Upon submission of two sets of drawings reflecting the information <br />requested, your application will be given priority and plan review will resume. <br />Mechanical <br />1. All submiltals should include the following: <br />a. Area served. <br />b. Nominal capacity (tons). <br />c. CFM. <br />d. Outside air CFM. <br />e. Type of operation: continuous or automatic. <br />f. Weight of RTU and weight of replacement RTU. <br />g. Smoke detector location (if applicable). <br />h. Gas heat input. <br />i. Anchorage details for mechanical equipment to meet structurai seismic and static loads. <br />j. Plan locations for the existing and new RTU. Please note on the drawings if [he new equipment <br />is going to be located in the same place. <br />2. An economizer is required for the new mechanical air handling unit, unless documentation is provided <br />indicating conformance with an allowable exception in WSEC section C903.3.1.1 Air Economizers. <br />3. If the weight of the replacement RTU is heavier than existing RTU or in a diffemnt locatron, structural <br />details and calcula[ions should be reviewed by a licensed Washington State Design Professional for all <br />suspended or rooftop mechanical units greater than 400 pounds. <br />a. Either the professional engineer should write a letter with a wet stamp to veriFy that the <br />slructure will carry the weight of the new RTU in the location shown on the �rawings ; or, <br />b. If the existing structure is not sufficient to carry the weight or resist the seismic irnpact of the <br />new air handling units, the engincer will need to submit wet-stamped freming plans, details and <br />calculations for structural revisions required. <br />Applicable codes include the 2012 International Building Code, the 2012 lnternational Fire Code, the 2012 <br />International Mechanical Code, and the 2012 Washington State Energy Code (WSEC). All codes referenced, <br />adopted by the City of Everett, should indude current revisions by the State of Washington. Revisions or <br />additions may be required by other departments (such as Utilities, Planning, or Fire). Please contact me if <br />you would like to discuss this letter by e-mail at mhalev@everett�va.gov or by phone at 425-257-8813. <br />� <br />�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.