My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
902 N BROADWAY CIRCLE K 2016-01-01 MF Import
>
Address Records
>
N BROADWAY
>
902
>
CIRCLE K
>
902 N BROADWAY CIRCLE K 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 7:55:08 PM
Creation date
1/24/2017 12:53:11 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
902
Tenant Name
CIRCLE K
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INFORMATION FOR DEVELOPER: <br />1. Detailed drawings Sn accordance with City llesi� and Const:uction <br />Standard� nhall De aubmitted to the Public Works Department ahowing <br />aite parking layout, landscaping, utilities, storm drainage, temporary <br />conatruction erosion crntrol, and all required improvementa in the <br />public right-of-way. Public Norks Department approval ot these <br />drawings is required p:ior ta any permits being lasued. All <br />improvements shall be completed� approved� and Narranted Oefore the <br />Occupancy Permit is lssued. <br />2. City aLreets and alleys ure to be kept cleat� of dirt and debris at all <br />timea during conatr•uction. Dust auppression and atreet cleaning muat <br />accur a� direeted by the Public Wcrks Inspector. <br />3. Performance guarantees are required for the atreet and landscaping <br />improvement�. <br />4. Permit� are required for destination of fi.11 within the Everett City <br />limits. <br />5. A one-year guarantee is required on the public street improvements for <br />an amount not lees than 10¢ of the cost of construction and shall run <br />for one year from the date of final approval/issuance of the first <br />Occupancy Permit for the project. <br />6. GTE Northwest will have facilities at this location. However, any <br />building entrances must be coordinated zt leayt 60 days in advance must <br />be coordinated at least 60 days in cdvance. Your contact at GTE <br />Northwest is Aay Oban at 339-2060 for this building entranee. <br />7. The City's Police Dept. recommends that the folloaing security measures <br />be taken: <br />a. A monitored armed robbery alarm sysLem should be provxded for the <br />gas etation. <br />b. A double key drop aafe as well as a money safe should be <br />provided. It is be�t Lo aequire a change safe, like 7-11 for the <br />gaa atation. <br />e. All other Lenants should have double cylinder deadbolts or <br />locking crashbar in perimeter doors and a monitored alarm system <br />zoned for each designated area. <br />d. Lighting of the parking lot should be a minimum of 1-2 foot <br />candles. <br />During final etages of constru,:tion, please contact Dick Ti�ornberry, Crime <br />Preventlon Officer� at 259-8837 C•or further recommendations. <br />s76uF <br />
The URL can be used to link to this page
Your browser does not support the video tag.