Laserfiche WebLink
. � ( � <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard 11601. <br /> �Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> 8. Connect rooftop downspouts to the drainage system provided tor this lot. <br /> �Rooftop runoff must be disr,harged to a roof downspout infiltration system per City oi Everett <br /> Storm Manual 3-2.62. Width�, Depth �, Length�.� <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> (,11 install erosion control measures as determined by the Public Works inspector, such as sitt <br /> fence, straw bales, swales, or erosion blenkets. <br /> 12. Install erosion control measures per City of Everett Standards for small parcels <br /> ,�?Rmove erosion control measures upon completion of the project prior to final approval of the <br /> � permit. <br /> , 14.,A11 excavated materiai from foundation, sidewalk and driveways shall be hauled to an <br /> - approved, permitted site. No westing ot material is allowed on this building lot. <br /> 15. Remove and replace curb, guNer and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways arid any broken or damaged area must be replaced). <br /> 16. Install a Type I concrete drivewey per City of Everett Standard N307. <br /> 17. Pave driveway from the tront property line out to the street paving. <br /> 18. Contact the Water District for connecting provisions for this buflding's <br /> water end sewer service�_. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system �s to be installed, the pressure line must discharge into e private <br /> manhole, then gravity flow across the public right-of-way. <br /> �) A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> P�YCommems <br />