Laserfiche WebLink
coMr�uHce NWEC LOVIf 1SE RESIDENTIAL COMI _IANCE CHECKLIST <br /> � REOUIRED� Electrlcally heated dwelllnps, s 3 atorles, Zone 1, Western Wa�hinpton <br /> vA i . ' <br /> INBPECTION �MPORTANT: Plea�e supply Inlormatlon requested In the shaded box below. <br /> APVROVED Dl�repard toplcs that don't deacribe your bulldlnp or equlpment. p0 NOT <br /> plece check� In ihe two lett columns. <br /> OUN ON PH SE: <br /> p 3 � O�lelltetl (Chapter 8, Optfon III, or Chap 4 only):Gtazing on the side ofl the <br /> ome must lace w In 45 degrees of due south. No rtwre ihan 60%ol the glazing may Ile between 31 to <br /> 45'of due Sout . <br /> Choosa a A or B optlon pnda wall Inau/af/on opt/on: <br /> ❑ ❑ Redon MI patlo requlrements wl be addressed by: <br /> ❑ A. 4'course grade grave base u er elab Qurisdiction wlll ofler Iree Radon monitoring optbn) <br /> OR <br /> O B. Slab won't be poured ove gravel base, Dwelling will be monflored lor Redon when <br /> completed. (DepaAmen staff will provide dutalled requiremente ol this optlon) <br /> � � Sleb Insuletlon will be ❑ 10 (ChqB, ail options)or ❑ R_(ChB4 or5): <br /> ❑ A. Exterior slab Insulatio III ex irostline or the siab bottom. <br /> OR <br /> ❑ B. Interior slab Insulation will extend downward iro the top s�ab suAace to Its undersuAace <br /> and horizontally under the slab tor a total dlsta ce ol 24", or verlically 24". <br /> ❑ � Bslow prade maeonry well Insuletlon will be: <br /> ❑R10(Ch q8,All options) on the exterior wall i stead o1 R19 Interior Insulation. See NWEC <br /> pp FINAL PHASE RE�UIREMENTS) <br /> ❑ R_(Chapler 4 or 5) <br /> ❑ ❑ Thermel break(s) wlll be placed In the sia belween the cond(tioned and uncondltbned spaces <br /> checked below,and extend irom the top of the stab t e bottom, then underneath toward the <br /> conditfoned space lor a 24"totel developed dimenslon. <br /> p dwelling/garage ❑ dwellinglconnected space ❑slab edge a d toundatfon wall. <br /> z �'. <br /> ❑ p Expoaed above•prade Insulation protecled wilh stucco coating,or m al or plastic flashing. <br /> p ❑ Vepor reterder(<1 perm) required under the slab because course grade ravel eilher is not installed or <br /> less than 2"thick. <br /> � p Ineulatlon Is approved lor sub•grade, exlerfor u�e anA properly installed. <br /> NWEC Foundallon phase requlrements: <br /> Approved by: <br /> Dele <br /> ,. <br /> S 111b018 U89d: �s wl� s rseror tNn <Is�• th�n rs�fer �h�n or s ual In� Ihu, or• ud � <br /> WEEf APPIL�0 <br /> Pape 3 of 7 <br />