Laserfiche WebLink
. � � <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> �Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> C8. J Connect rooftop downspou:s to the drainage system provided for this lot. <br /> � <br /> 9. Rooftop runoH must be discharged to a roof downspout intiltration system per City of Everett <br /> Storm Manual 3-2.62. Width _, Depth _, Length_. <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> �11 Install erosion control measures as determined by the Public Works inspector, such as silt <br /> _.fence, straw bales, swales, or erosion blenkets. <br /> 12. Install erosion control measures per City of Everett Standards for small parcels <br /> ��j Ren�ove erosion control measures upon completion of the proJect prior to final epproval of the <br /> / permi!. <br /> C�1 All excavated material irom foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this buildfng lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standerd Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector(i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Install a Type I concrete driveway per Ciry of Everett Standard k307. <br /> 17. Pave driveway from the front property line out to the street paving. <br /> 18. Contact the Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trep per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a privete <br /> manhole, then graviry ilow across the public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> 'Wf.omment5 � <br /> Cr434 ���Y �'� <br />