Laserfiche WebLink
everett INSPECTION REPORT <br /> � Address —_lp.c?� s ��a�_��—_ <br /> Contractor C 2� N v�l A�.uT�'.u�, <br /> � \ <br /> Owner �` �� _ <br /> Date _ <br /> TYPE OF INSPECTION REQUESTED <br /> �BLOG: Pmt. No. 20\\�y I 1 MECH: Pmt. No. _ <br /> I 1 ELEC: Pmt. No. I '�. PLBG: Pmt. No. __ <br /> ❑ Temp. Elect. ❑ Framing ❑ Gae Piping i <br /> �Footing ❑Drywall,Nalling ❑Consultation <br /> Foundetion ❑Shear Nailing ❑ Groundwork <br /> ❑ Ductwork ❑Grid ❑ Struct. Slab <br /> ,",,'.'. ❑Wood Slove ❑Aough•In ❑ Final <br /> ❑ Mesonry ❑ Service ❑ <br /> APPROVAL ❑ PARTIAL APPROVAL <br /> ❑ VIOLATION ❑ CORRECTION REQUIRED <br /> i i Corrections listed betow MUST BE MADE before work can be approved. <br /> ❑ Please contect inspector and arrange lor appointment. <br /> ❑ Was not able to peAorm inepectlan. � <br /> ❑ CALL 259•8810 FOR REINSPECTION—24 haur notice required. i <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON ' <br /> THE PREMISES PRIOR TO OCCUPANCY. I <br /> � <br /> Inspector _ -« Datu �� � <br /> � � <br />