Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Work: approved pian dated <br /> 5. Cennect side sewer per City Standard #601. <br /> 6. Connect side sewer per City Slandard #'s 601, 602 604. <br /> 7. Connect all rooftop downspo��ts tc the side sewer. <br /> 8. Connect rooftcp downspouts to the drainage system provided for tfiis lot. <br /> 9. Roottop runoff must be disch:rged to a roof downspout infiltration system per City of Everett <br /> Storm 1�lanual 3-2.6.2. The approximete size im ich is,3.5' v�ide,2' deep and 25' long. See <br /> attachment for more details. '�� - '� <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning lhe project. <br /> 11. Inslall erosion control measures as determined by the Public Works inspector, such as sill <br /> (ence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per City o( Everett Standards for small parcels <br /> 13. Remove erosion control measures upon complelion of the project prior to final approval of lhe <br /> permit. <br /> 14. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> appro�ed, permitted sile. No wasting of material is allowed on lhis building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City�f Everett Standard Plan #'s 305A <br /> 8 306 on this proposal's fronta�e as directed by the Public Works Inspector (i.e. ail unused <br /> driveways and anv broken or damaged area must be replaced). <br /> 16. Install a Type I concrete dri�•eway per City of Everelt Standard #307. <br /> 17. Pave driveway from ihe (ront property line out to the street paving. <br /> 18. Contact the Water Districl for connecling provisions for this building's <br /> water and s�wer services. <br /> 19. A catch basin as per City Standard Plan #402 wilh a gas lrap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity (low across the public right-of-way. <br /> 21 A sprinkler system is required for this building in compliance wilh the requirements oi NFDA <br /> Standards 13D. <br /> �,;c �„-,.,�s �ti <br />