Laserfiche WebLink
� ' . i <br /> . ADDENDUM TO THE ENVIROi1t1E1JTAL CHECKLIST I <br /> O,N TfIE EiEVERLY LAKE CONDOt1INIUt1S <br /> Soils Test <br /> II 1: b , c An analysis of the quality of the soils at <br /> the site will be arranged by the developer <br /> and the results of the analysis proyided ta <br /> the City of Everett when applications for <br /> Luilding permits are filed. <br /> Storm Draina�e and Runoffs <br /> II 3 : e During the period of constructi.on , prior to <br /> � landscaping, there will be straw bales staked <br /> • into place along the edge of the lake in <br /> . order to prevent any �water-borne silt or par- <br /> ticulates , clue to erosion , from reaching the <br /> lake. <br /> The aUove is taken as a precautionary step to <br />� avoid any problems which could result from <br /> heavy rainfall while the site is being devel- <br /> oped. We }iave found that properly placed and <br /> siaked straw bales provide an e`fective mean� <br /> of straining ihe runoff in .order to reduce si].t. <br /> Storm wat�.r runoff from the parking areas will <br /> be collected into a tight-line storm drainage <br /> conveyance system through the use of commer- <br /> cially avciilable catch basins. E:ach catch <br /> basin will be fitted with a 90° e].bow, turned <br /> down , so that all floating debris will be ex- <br /> . cluded from the system and therefore from the <br /> lake . Note that in no case will inlet struc- <br /> tures be used on this project for storm water <br /> collection. , <br /> Prior to the storm water reaching t-he lake an <br /> oil- water separatox� will Ue installed . This <br /> oil-water separator will be of the type com- <br /> mercially available and will be apprcved by <br /> the Ciiy of Everett prior to �nstal] ati.on. <br />