Laserfiche WebLink
11 <br />EDCIROH <br />Bellevue <br />Everett <br />Spokane <br />Portland <br />San Diego <br />Austin January 20, 2009 <br />Mr. Jim Anderson <br />Velocitel, Inc. <br />12600 S.E. 381b Street <br />Suite 130 <br />Bellevue, WA 98006 <br />RE: PUDIBroadway <br />SE01511A <br />2320 California Street <br />Everett, WA 98201 <br />Dear Mr. Anderson, <br />130`ioa-o70 <br />Per your request, DCI Engineers has reviewed the above cellular site location for the purpose of <br />installing an additional mechanical unit on the roof. Beside the existing 2,000Ib Purcell cabinet and <br />the 80011p Nokia Ultrasite cabinet, a new Nokia'Ultrasite cabinet (800 lb max weight) is to be installed. <br />There is also a smaller, empty cabinet to the east of this. This cabinet is assumed to be mostly empty <br />and not used for heavy storage. <br />After reviewing the information provided of the existing roof framing, it appears that the structure is <br />capable of supporting this new cabinet as shown on the layout on your drawings. <br />The new cabinet should be positivell, attached to existing mechanical structural support at each <br />corner with 518" diameter lag bolls as shown on your drawings. <br />Please contact our office if you have any questions regarding this letter or if we can be of any further <br />service to you. <br />Sincerely, <br />DCI Engineers <br />A to'-� <br />Mathew Wes, P.E., S.E. <br />Project Manager <br />10(1x) Nt 4th Street, Suite 12001Bellevue, Washinglon, 96" 1lyine (425) 827-2238 <br />r� n,,V H I I O II V a I <br />