Laserfiche WebLink
, i <br /> CLOSED C!1 WORR ORDERS REPORT <br /> Total Utility Maintenance Management Sy�tem <br /> 04/24/1995 Page 1 <br /> __________�___�__�_______�___�__�______-____�______�___=_____��_�_���_��_______� <br /> Date Range : 01/09/1989 - 04/18/1995 <br /> CM Work Order Range :1001091070001 - 8801086100085Pattern : 7101236730030 <br /> Item Ranqe. :<Blank> - WW22020001 Pattern : * <br /> Program A?�L Function ALL Activit:y ALL <br /> ocvvcvvcccaec=cvc==eo--c=000c=e==ocv�==vcoe=eveccocc==vicecovvoccc---vec=eeevevcc • <br /> CM WORK ORDER ID: 7101236730030 Title: PRIVATE 6930 CAP.SON ROAD <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» r(� <br /> Item ID: -- <br /> Location ID: -- <br /> Program 710 Fuhction 123 Activity 673 <br /> Date Completed: 04/1D/1995 <br /> Overall Cr.aft: <br /> issued: 03/27/1995 Issued by: HDA Assigrad to: <br /> out of Service? NO Priority: Travel Time: O. OU Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> SLatus: tiL <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ----..------------------------- ----------- ---------- ---------- <br /> DL AGE2 ALLEN, JR. , GARY E. 0.00 6.00 64.00 <br /> UL GCR GREN;:NER, CNRIS R. 0.00 8.00 107.60 <br /> DL IED ILES, ERIC D. 0.00 12. 00 96.00 <br /> UL NCR NIETIIAMER, CHARLES R. 0. 00 4 .00 53.76 <br /> HEO SDD STECNER, DF�NIEL D. 0.00 12.00 231.24 <br /> Total Labor Cost: 552. 60 <br /> Materials: <br /> ID Description Date # Used Cost <br /> ------------ -----------------------.._..---- -------- -------- ---------- <br /> BRIC00061156 SRICK CONCRETE 2" X 4" X �" 04/14/1995 13 5.33 <br /> CEME00061438 CEMENT 20 MIN. SET 50 LB. BAG 03/28/1995 2 1.2.08 <br /> CEME00061438 CEMENT 20 MIN. SET 50 LB. BAG 04/14/1995 1 11.Q4 <br /> PIPE46704347 PIPE 8" PVC SEWER 03/28/1995 2 5. 12 <br /> Total Material Cost: 43. 57 <br /> vehiclass <br /> ID Description Hours Cost <br /> ------------ ------------------------------ ------ ---------- <br /> V2133 84 DnDGE 1 TON 4. 00 19.20 <br /> V3507 88 C4SE BACKHOE 4X4 12. 00 513.60 <br /> Total Vehicle Cost: 532.80 <br /> Total cost for work order 7101236730030: 1128.97 <br />