Laserfiche WebLink
- -- <br /> � 3 <br /> CLOSED CM WORK ORDERS REPORT <br /> Total Utility Maintenance Manaqement System <br /> 11/O1/1994 Page _ <br /> ------------------------------- ------------------------------------- ------------ <br /> Date Range : 10/01/1992 - 10/27/1994 <br /> CM Work Order Range :<Blank> - 8405421080001 Pattern :7101196750001 <br /> item Range :<Blank> - WW22020001 Pattern : * <br /> Program ALL Function ALL Activity ALL <br /> --------------------------------------------------------------------------------- <br /> CM WORK ORDER ID: 7101196750001 Title: AFTER HOURS 1216 CASCADE DR <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: -- <br /> Location ID: -- <br /> Program 710 Function 119 Activity 675 <br /> Date Completed: 10/24/1994 <br /> Overall Craft: <br /> Issued: 10/24/1994 Issued by: GJ Assigned to: <br /> Out of Service? NO Priority: Travel Time: 0.00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status: <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ ----------- ---------- -----�----- <br /> WST AGE ALLEN, GARY E. 0. 00 3.00 59. 19 <br /> Total Labor Cost: 59 19 <br /> Materials: <br /> ID Description Date # Used Cost <br /> ------------ ------------------------------ -------- -------- ---------- <br /> ADAP34000547 ADAPTER 3/4" MIP X INSTA-TITE@ 10/26/1994 1 7.59 <br /> COUP34142847 COUPLING 3/4" CTN X 3/4" MIP @ 10/26/1994 1 2.97 <br /> ELL034101547 ELL 3/4" 45 DEG BRASS ' 10/26/1994 1 1. 51 <br /> PIPE34060647 PIPE 3/4" POLY I.P.S. 10/26/1994 1 0.24 <br /> Total Material Cost: 12. 31 <br /> Vehicles: <br /> ID Description Uate Hours Cost <br /> ------------ ------------------------------ -------- ------ ---------- <br /> V0017 94 FORD AEROSTAR VAN 10/23/1994 3 . 00 15. 30 <br /> V2150 SVC TP.UCK FORD 2 TON 87 10/23/1994 3 .00 15.60 <br /> V2230 FORD 800 10 YD '91 10/23/1994 3.00 76.50 <br /> V3505 BACKHOE CASE 62 10/23/1994 3.00 51.90 <br /> TotaJ Vehicle Cost: 159. 30 <br /> Work Description: <br /> -------------------------------------------------------------------------------- <br /> 3/4 PLASTIC SERVICE REPAIRED. <br /> Total cost for work order 7101196750001: 230.80 <br />