Laserfiche WebLink
CI.03BD Q! f10R1C ORDffiLS RSPORT <br /> Tota�. Utility Maintenance ![anagement System <br /> 06/25/1996 Paqe 1 <br /> �a�a�vev�as=vsa�aa�aa�vv�s��ans�as=asaa <br /> Date Ranqe :01/09/1989 - 06/25/1996 <br /> CM Work Order Ranqe :1001091070001 - UT1002- - Pattern :7101196750738 <br /> Item Ranqe :<Blank> - WW2202o001 Pattern :+► <br /> Proqram i►LI. Function �►I.L l,ctivity 1�LL <br /> �� �-�x a <br /> CM IqORK ORDER ID: 7101196750738 Title: RENEW .75 INCH 7404 CIUSCADE DR <br /> Item ID: WS0785R031 -- WI►TER SERVICE <br /> Location ID: <br /> Proqram 710 Function 119 Activity 675 <br /> Date Completed: 06/07/1996 <br /> overail Cralt: <br /> Issued: 06/07/1996 Issued by: GJ Assiqned to: <br /> Out of Service? NO Priority: Travel Time: 0.00 Hr. <br /> Meter Readinq: <br /> Downtime: o hours <br /> stntus: <br /> Materials: <br /> ID Description Date / Used Cost <br /> ------------------------------ -------- -------- --------- <br /> 1►DAP34000347 ADAPTER 3/4" C3T X INSTA-TITE@ 06/07/1996 2 15.86 <br /> AD71P34000347 ADIIPTER 3/4" CST X INSTA-TITE@ 06/11/1996 1 7.93 <br /> AD11P34000547 ADl1PTER 3/4" MIP X INSTA-TITE@ 06/07/1996 1 7.68 <br /> 1WAP34000647 11DAPTER 3/4" FIP X INSTA-TITE@ 06/il/1996 1 7.16 <br /> BOX000056247 BOX IiETER PI.7� 15^ X 10^ W/LID 06/07/1996 1 12.96 <br /> COUP34003947 COUPLING 3/4" 1/4 BEND COPPER@ 06/11/1996 1 7.53 <br /> COUP34004247 COUPLING 3/4° FIP X COP ELL @ 06/07/1996 2 8.02 <br /> COUP94010147 COUPLING 3/4" IPS COMP X MIP @ 06/07/1996 2 10.58 <br /> COUP34010147 COUPLING 3/4" IPS CONP X MIP @ 06/il/1996 1 5.29 <br /> N�� �Tgg J�1!(pER (FROM 3TOCK) 06/07/1996 1 0.00 <br /> PIPE34060647 PIPE 3/4" POLY I.P.S. 06/07/1996 4 0.96 <br /> PIPE34060647 PIPE 3/4^ POLY I.P.S. 06/il/1996 1 0.24 <br /> SETT34033647 3ETTER COP 5/8^ X 3/4" (H12") 06/07/1996 1 __ 52.32 <br /> Total Material Coat: 136.53 <br /> Work Deacription: <br /> ------------------------------------------------------------------------- <br /> REF. WI�TER lU�IN CONSTRUCTION WO/ 710-119-673-0738 <br /> Total cost for work order 7101196750738: 136.53 <br />