Laserfiche WebLink
CLOBED C14 RORIC ORDERB REpORT <br /> Total Utiiity Maintenance Management System <br /> 07/17/1997 Page 1 <br /> a=ee=e�=aavaaa�a-a--�_a saa --��__�_�_ <br /> - �-�- - -�-- -�'-_vveve=avevn�a==veeeaec�eeve'e�e=v=e=e'eve= <br /> Date Range :12/03/1900 - 07/OS/1997 <br /> CM Work Order Ranqe :1001091070001 - PW2548-19- Pattern :7101196751132 <br /> Item Ranqe :<Hlank> - WVL3694L05 Pattern :* <br /> Proqram ALL Function ALL Activity ALL <br /> seasaaa�oaaasv��amesvaa�ava�azmamaaamaav�vaezeaaaaa�asaaaaa���3aevaea����_a_�_a <br /> CM WORK ORDER ID: 7101196751132 Title: CONVERT 7404 CASCADE ^R <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: WS0785K031 -- WATER SERVICE <br /> Location ID: __ <br /> Proqram 710 Function 119 Activity 675 <br /> Date Completed: 06/24/1997 <br /> overall Cratt: <br /> Issued: 06/24/1997 Issued by: WMW Assiqned to: <br /> Out of Sarvice? NO Priority: Travel Time: 0. 00 Hr. <br /> Meter Reading: <br /> Downtime: o hours <br /> status: <br /> Labort <br /> Craft ID Name Planned Hrs Actual Hrs <br /> ----- ------ ------------------------------ -- Cost . <br /> UL CSG CAVANAH� SHANE G. � <br /> WST WDT WALDEN, DAROLD T. 0.00 1. 50 Zp,yZ <br /> 0.00 1. 50 31.85 <br /> Total Labor Cost: 52 07 <br /> ltat�rial�: <br /> I� Deacription Date <br /> ------------ ------------- $ Used Cost <br /> ----------------- -------- <br /> METE36089447 METER 5/8'� X 3/4" NEPTUNE T-10 06/24/1997 1 <br /> 30.67 <br /> Total Material Cost: 30.67 <br /> V�hiol�as <br /> I� Description Hours <br /> ------------ Cost <br /> ------------------------------ <br /> V2117 91 CHEV 1-TON HYD UNIT <br /> _-1. 50 ----_-7-95 <br /> Total Vehlcle Coat: 7,95 <br /> Work Description: <br /> ---------------------------------- <br /> ------------------------------ <br /> METER �44908325 -------'-"---- <br /> Total cost for work order 7101196751132: <br /> 90. 69 <br />