Laserfiche WebLink
�..rs. - - � - --�_._^ <br /> y <br /> C7ASED CM WORK ORDERS REPORT <br /> Total Ukility Maintenance Management System <br /> 12/28/1994 Page 1 <br /> _________�----------------------- <br /> --------------_____________________________�___________________________ <br /> Date Range :O1/09/1989 - 12/20/1994 <br /> CM Work Order Range : 0810800810001 - 8405421080001Pattern :7101236730006 <br /> Item Range :<Blank> - WW22020001 Pattern : * <br /> Program ALL Function ALL Activity ALL <br /> _��__�_�_�_�_____�_�__��___�____�_____________________________________________ <br /> CM WORK ORDER ID: 7101236730006 Title: INSTALL 7515 - CASCxDF DR� <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: -- <br /> Location ID: -- <br /> rr��qram 710 Function 123 Activity 677 <br /> Date Completed: 12/19/1994 <br /> Overall Craft� <br /> Issued: 11/04/1994 Issued by: HDA Assigned to: <br /> Out of Service? NO Priority: Travel Time: 0. 00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Stetus: HL <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ ----------- ---------- ---------- <br /> HEO AAL ARNOLD, ARTHUR L 0.00 44 . 00 814 .88 <br /> UL GCR GREN2NER, CHRIS R. 0. 00 36.00 468 . 72 <br /> EO MJL2 MITCHELL, JEFFREY L. 0.00 12 .00 215 .40 <br /> UL NCR NIETHAMER, CHARLES R. 0. 00 78.00 1015. 56 <br /> HEO SDD STECHER, DANIEL D. 0.00 83 .50 1556. 7.1 <br /> EO SR SIERRA, RAMON (NMI) 0. 00 82.00 1471.90 <br /> Total Labor Cost: 5544 . 57 <br /> Maturials: <br /> ID Description Date p Ueed Cost <br /> ------------ ------------------------------ -------- -------- ---------= <br /> BRIC00061156 BRICK CONCRETE 2" X 4" X 8" 11/03/1994 14 5.88 <br /> BRIC00061156 BRICK CONCRETE 2'� X 4" X 8" 11/16/1994 4 1. 68 <br /> BRIC00061156 BRICK CONCRETE 2" X 4" X 8�� 11/18/1994 13 5.46 <br /> CEME00061438 CEMENT 20 MIN. SET 50 LB. BAG 11/03/1994 2 21. 74 <br /> CEME00061438 CEMENT 20 MIN. SET 50 LB. BAG 11/10/1994 3 32 .61 <br /> CEME00061438 CEMENT 20 MIN. SET 50 LB. BAG 11/l5/1994 • 2 21.96 <br /> CEME00061438 CEMENT 20 MIN. SET 50 LB. BAG 11/16/1994 1 10.98 <br /> CEME00061438 CEMENT 20 MIN. SET 50 LB. BAG 11/18/1994 3 32.9 <br /> N/A C.D.F. (ASSOC) 11/04/1994 1 101.4� <br /> N/A CB/FRAME/GRATE (ASSOC) 11/04/1994 1 211.49 <br /> N/A TOP COARSE (ASSOC) 11/07/1994 1 68.72 <br /> N/A C.D.F. (ASSOC) 11/08/1994 1 126. 78 <br /> N/A C.D.F. (ASSOC)- 11/10/1994 1 405. 70 <br /> N/A CB 17/C815/RISER (ASSOC) 11/10/1994 1 250. 87 <br /> N/A CB/RISER (ASSOC) 11/11/1994 1 208. 25 <br /> N/A C.D.F. (ASSOC) 11/11/1994 1 329.64 <br /> N/A TOP COARSE (ASSOC) 11/14/1994 1 59. 05 <br /> N/A TOP COARSE (ASSOC) 11/14/1994 1 56. 56 <br /> N/A C.D.F. (ASSOC) 11/14/1994 1 481.77 <br />