Laserfiche WebLink
i � <br /> PUBLiC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard ti601. <br /> �� Connect side sewer per City Standerd #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> 8. Connect rooHop downspouts to the drainege system provided for thi� lot. <br /> / 9. JRoottop runoH must be dischargod to a roof downspout infiltration system per City of Everett <br /> �•� Storm Manual 3-2.6.2. Width�, Depth ;�,�, Length$(�. <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the Froject. <br /> 11. Install erosion control measures as determined by the Public Works inspector, such as silt <br /> tence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per City of Everett Standards tor small parcels <br /> 13. Remove erosion control measures upon completion of the project prior to final approval of the <br /> permit. <br /> 14. II excavated material from toundation, sidewalk and driveways shall F�e hauled to an <br /> approved, permitted site. No wasting of material is allowed on this buiiding lot. <br /> 15. Remove and replace curb, gutler and sidewalk as per Ciry oi Everett Standard Plan tt's 305A <br /> & 306 on this proposal's trontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 17. Pave driveway from the iront property line out to the street paving. <br /> 18. Contact the _ Water District for connecting provisions tor this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan �410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity fiow across the public right-of-way. <br /> 21 A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> � <br /> i <br /> / L �'C,, �` �'�� ��:� �,� �� Z/z <br /> PWComments <br />