Laserfiche WebLink
. - + <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plen dated <br /> 5. Connect side sewer per City Standard #601. <br /> � Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> 8. Connect rooftop downspouts to ihe drainage system provided for this lot. <br /> �Rooftop runoff must be discharged to a roof downspout infiltration system per City af Everett <br /> Storm Manual 3-2.6.2. Width _, Depth _, Length _ <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 11. Install erosion control measures as determined by the Public Works inspector, such es silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per Ciry oi Everett Standards for small parcels <br /> 13. Remove erosion control measures upon completion of the project prior to final approval of the <br /> permit. <br /> 14. All excavated material from foundation, sidewalk and driveways shall be heuled to an <br /> approved, permitted site. No wasting of material is allowed on this building lot. <br /> 15. Remove and replace curb, guner and sidewalk as per City of Everett Standard Plan �'s 305A <br /> & 306 on this proposal's trontage as directed by the Public Works Inspector(i.e. all unused <br /> driveways and any broken or damaged aroa must be replaced). <br /> 16. Install a Type I concrete driveway per City of Everett Standard k307. <br /> �s �7yPave driveway from the iront property line out to ihe street pavin � d^� bat e <br /> '1 � tNC/LiS Q� /larrrrl � L('w.�b11�6 CMG/'CI�' i��n� �� �f'".� l� � �...f�� <br /> l <br /> 18. Contact the Water District tor c nnecting provisions tor this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan tt410 is <br /> required for ihe parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity ilow across the public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> a,vccmTems <br />