Laserfiche WebLink
PUBLIC WORKS �'ERMIT COMMENTS <br /> 4. As per Pubiic Works approved plan aated <br /> 5. Connect side sewer per City Stan,iard #601. <br /> �; Connect side sewer per City S:andard #'s 601, 602, 604. <br /> 7. Connect all rooftop dewnsp�uts to the side sewer. <br /> 8. / Connect roo(top downspouts to the drainage system provided for this lot. <br /> � � Rooftop runof(mus! be discharged to a roof downspout in(iitration system per City o( Everett <br /> Storm Manual 3-2.d.2. The approxima�2 size trench is 3.5' wide, 2' deep and 25' long. See <br /> attachment for more details. <br /> 10. The contractor must ineet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 11. Install erosion control measures as determined by the Public iNorks inspector, such as silt <br /> (ence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per C�ty of Everett Standards for small parcels <br /> 13. Remove erosion control measures upon completion of the project prior to final approval of the <br /> permit. <br /> / <br /> �1� All excavated material from foundation, sidewalk and driveways shali be hauled to an <br /> � approved, permitted site. No wasting o(material is allowed on this ouilding lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> 8 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> � <br /> driveways and any broken or damaged area must be replaced). <br /> ( 16..� Install a Type I concrete driveway per City o( Everett Standard #307. <br /> , /17. Pave driveway from the iront property line oul to the street paving. <br /> l <br /> 18. Contact the Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Slandard Plan #402 with a gas trap per Standard Plan #410 is <br /> required (or the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> ,,,. ,,m� :�s <br />