Laserfiche WebLink
' J <br /> CL08ED CM WORK ORDERS REPORT <br /> Total Utility Maintenance Management System page 1 <br /> 06/02/].995 <br /> Date Range : O1/09/1989 - 05/31/1995 � <br /> CM Work Order Range : 1001091070001 - 8801086100085Pattern :7101236710030 <br /> Item Ranqe :<Blank> - WW22020001 Pattern : * <br /> Program ALL Function ALL Activity ALL <br /> ------------ <br /> CM WORR ORDER ID: 7101236710030 Title: REPAIR 1403 - Eik54 CASINO RO�k47 �'�` <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: DCB0785T05 -- CATCH BASIN A <br /> Location ID: -- ' Activit 671 <br /> Program 710 Function 123 Y <br /> Date Completed: 05/16/1995 <br /> overall Craft: <br /> Issued: 05/10/1995 Issued by: HDA Assigned to: <br /> Out of Service? NO Priority: Travel Time: O. OG Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status: HL <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ - <br /> ---------- ---------- -------- <br /> SUP1 AGA AHLES, GREGORY A. 0.00 4 .00 88.00 <br /> HEO MCC MAGEE, CARL C. 0.00 4.00 78.24 <br /> UL MHA MAROON, HERBERT ARTHUR 0. 00 4 .00 _____48_84 <br /> Total Labor Cost: 215. 08 <br /> Mnterials: <br /> ID Description Date q Used � Cost <br /> --------•---- ------------------ <br /> ------------ -------- -------- <br /> BRIC00061156 BRICK CONCRETE 2" X 4" X 8" O5/1G/1995 lZ 22,08 <br /> CEME00061438 CEMENT 20 MIN. SET 50 LB. BAG 05/1G/1995 2 <br /> Total Material Cost: 27 •00 <br /> vehicles: <br /> ID Description Hours Cost <br /> ---- ------ ------ <br /> ------------ ------- ------------------- <br /> V2048 89 GMC S15 4 . 00 17.60 <br /> V3603 86 CASE BACKHOE 780 4 . 00 169. 60 <br /> VJ0002 93 INTERNATIONAL 10 YD 4 . 00 _____94_40 <br /> Total Vehicle Cost: 281. 60 <br /> Work Description: <br /> ------------------------------------------------------------------- <br /> REPLACED CB FRAME AND GRATE. AHLES <br /> Total cost for work order 710123G710030: 523. 68 <br />