Laserfiche WebLink
i <br /> � <br /> 1 SUMMARY OF TRIP GENERATION RATES I <br /> Land UselBuilding Type Office Park ITE Land Use Code 750 <br /> Independent Variab!e—Trips per 1,000 Gross Square Feet <br /> Average Number Average Size ol <br /> Trip Maximum Minimum Corielation o( Independent <br /> Rate Rafe Rate Coe/liciont Studies Varjable/Sfudy <br /> Avarage Weekday Vahicla Trip Ends Z0.65 30.30 9.40 <br /> Peak A.M. Enter 1.98 3.20 1.58 5 <br /> Hour Between Exit 0.26 0.64 0.17 <br /> ol 7 and 9 Total 2,63 5.89 1.33 <br /> Adjacent P.M. Enter 0.33 1.00 0. 18 <br /> Street Between Exit 1.84 3.24 1 ?9 <br /> Traffic 4 and 6 Total Z,36 4.50 1.5 <br /> Peak A.M. Enter 1.98 3.20 1.58 <br /> / Hour Exit 0.26 0.64 0. 1 _ <br /> � o� Total 2.63 5.89 9S <br /> Generator P.M. Enter 0.33 1 <br /> Exit 1.84 'i <br /> Total <br /> Saturday Vehicle Trip Ends <br /> Peak Enter <br /> Hour of Exit <br /> Generator Total <br /> Sunday Vehicle Trfp Ends <br /> Peak Enter <br /> Hour oi Exit <br /> Generator Total <br /> 4, 9, 15 <br /> Source Numbers — ---- <br /> ITE Technical Committee 6A-6—Trip Generation Rates , <br /> . i <br /> � Date: 1975 ---- ------ --- ---- <br />