Laserfiche WebLink
Bob Landle Planning Departmenv _, ~ ,. <br /> , :f � ,.. •. <br /> :n . .; ,.,: <br /> � �aoM Public or s Departmenti '�V -' • . ; 'iJI <br /> ,�;i� ,.... <br /> owre Junc l l, 1982 / "'' ' - -i ��;;` <br /> I <br /> s�e�ecr S.E.P.A. Checkllst Review II82-3? 'f`l�r�o�er+�.�+i�j}��w•s���croN <br /> Rezone 7-82 �nlr.; ;;eat <br /> FROPOSAL: <br /> Contract rezone on 2.9 acres and construcUon of approximately 3S,SS0 sq. <br /> ft. retaii shopping center. <br /> REC:OMMENDATIONS: <br /> It ie the recommendadon of the Public Works Department that issuance <br /> of a Negadve Declazatlon be subject to the following: <br /> l. Detatled drawings shall be submitted to the Public Works Department <br /> showing site parking layout, landscaping, utll[ties, storm drainage, <br /> temporary construction erosion control and all required improvements <br /> in the public right-of-way. Publlc Work� Department approval of <br /> these drawings is required prior to any permits being issued. All <br /> impravemenn shall be completed, approved and warranted before <br /> the Occupancy Perml't [s issued. <br /> 2. Peri�rmance guarontees are required for landscaping. <br /> 3. Participatlon in the co�t to fund the Southend Sewer Interceptor is <br /> , requlred. The approxlmate co�t based on the prellm(nary information <br /> prov(ded t� $.117/aq. ft. tor Retail, $•213/sq. ft. for Ofilce, $•0213/sq. <br /> ft. !or Warehoux and $•234/sq. ft. tor Grocery. The actual cost shall <br /> be computed by the Buil�ng Department per the Ordinance in effect <br /> at the dme and according to the information provided on the appraved <br /> plane o� the date o! permit is�uance. <br /> 4. On-slte detentlon ie required. <br /> S. Durins construction, all trudc traiflc to and from the site within the <br /> Clty oi Everett shall be on arterial atreets unless otherwlse approved <br /> by the Public Works Department. • <br /> 6. City eueets and alleys are :o be kept clear of dtrt and deh•is at all <br /> tlmes during constructlon. Du+t suppression ano stroet cleaning must <br /> occ�a as directed by the Publlc Works Inspector. <br /> 7. All expoaed giro�nd must be reseeded wlthin 30 days of the completlon <br /> of construction. I! building activity commences within 30 days <br /> uf the completlon o! conetrucUo�, rexeding will not be required. <br /> fi reseeding is not practical due to weather or seasonal problems, the <br /> growd must be coverr.d with mulch as Nrected by the City Engineer. <br /> 8. Arbuilts of storm xwe: rystem can be submitted as prints and must <br /> be submitted before rhe Occupancy Permit is issued. <br /> I <br />