My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
205 E CASINO RD 2018-01-02 MF Import
>
Address Records
>
E CASINO RD
>
205
>
205 E CASINO RD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2023 10:03:12 AM
Creation date
1/24/2017 11:12:21 PM
Metadata
Fields
Template:
Address Document
Street Name
E CASINO RD
Street Number
205
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> i <br /> CONCOMITANT AGREEAIE,JT TO RGZON[ ORDI���1`CE VO. 533-32 <br /> This Agreeinent, madc and entcred into this 23th day oi �cptember 1932, hy and <br /> i between the City ot Everett, a municipal corporetion, heneinatter cailed the City, <br /> i� and Casino Road Enterprises, hereinafter called the Owncr, WITNESSETH: <br /> WHEREAS, such rezoning and development to the new zone standards would . <br /> create a situation where the site �:ould develop under a unified development site <br /> il plan that best serves the general public and protects the public health, safety, and <br /> il welfare. <br /> , I <br /> �; WHEREAS, the standards, conditions and requirements mutually agreed upon <br /> � �nil�ig�k <br /> � are anticipated to w►igutethe impacts of this development. <br /> NOw, THEREFOttE, IT I5 MU7UALLY AGRGED AS FOLLOws: � <br /> " � 1. That detailed drawings shall be submitted to the Pubiic Works <br /> ;� Department showing site parl<ing layout, landscaping, utilities, storm <br /> , drainage, temporary construction erosion control and all required <br /> '� improvements in the public right-of-way. Public ��'orks Department <br /> approval of thr,se drawings is required prior to any permits bcing issued. <br /> '� All improvements shall be completed, approved and warranted before <br /> �� the Occupancy Permit is issued. <br /> II 2. Participatian in the cost to fund the 5o ::`�end Seaer Interceptor is <br /> � required. The approximate cost based on the prelirninary intormation <br /> �I provided is $.117/sq. ft. for Retail, $.213/sq. tt. for Office, $•0213/sq. <br /> j� ft. for Wareheuse an: $.234/sq. ft. for Grocery. The actual cost shall <br /> i be computed by the Duilding Department per the Ordinance in effect at <br /> the t;me and according to the intormation provided on the approved <br /> I� pla:s dn the date of permit issuance. <br /> ji 3. De:ention is required; all detention shall be approved hy the Cverett <br /> Public Works pepartment. On-site detention rnay be rnet by a <br /> ilcontribution to a regional detention system. <br /> I <br /> ii 4. During construction, all truck traffic to and [ro�n tiie site within the <br /> �; Cit'y of Everett shall be on arterial streets unless otherwise approved by <br /> !I the Public Works Department. <br /> i <br /> I <br /> 5. City streets and alleys are to be Icapt cic�ir ;[ dirt and debris at all <br /> times during construction. Dust suppression and street cleaning must <br /> il occur as 6irected by the Public Works Inspec,or. <br /> i <br /> I 6. All exposed ground must be reseeded within 30 days ut tlie compiction <br /> � of construction. lf building activity coinmenccs within 30 days of the <br /> ij <br /> � eompletiun of construct m, reseeding will not be required. If reseeding <br /> i is not prectical due to weather or seasonal proSlems, the ground must <br /> ;� be covered with mulch as directed by the Ciry Enginecr. <br /> , <br /> i7. As-builts of storm sewer system can be submitted ns prints and must be <br /> �� submitted before the Occupancy Permit is issued. <br /> � <br /> il 8. A one year 1�'arrantee Gua�antee is required on thr_ public landscaping <br /> i for an amount not less than 10`Y� of the cost of cunstruction and shall <br /> rwi for one year [rom tlie date of final approval/issuance uf tlie first <br /> Occupar,cy Permit for the projer,t. <br /> � 9. A two year Warrantee Guarantee is required tor private detention <br /> I facilities. <br /> i� <br /> �� <br /> I I <br /> � <br /> ,� <br /> ;I <br /> � �I <br /> ( <br />
The URL can be used to link to this page
Your browser does not support the video tag.