Laserfiche WebLink
� Michael Spano <br /> Subject: Plans for Casino Road Square <br /> .April l4, 1983 <br /> Page Two !,, �,h <br /> K ' <br /> 2. Catch Basins pJ, 4, 5, 6, 8, 9 and 10 and Type "A" Catch Basins 1/3, 4 <br /> and 8 have restrictors. <br /> 3. The catch basin on the r.ast slde of the entrance to the proJect isin <br /> the radlus, not at the pc+lnt of curvature as shown. Consult the <br /> Casino Road destgn plans for Invert and ground elevations and <br /> stations. <br /> 4. Show the drainage irom the back of the L.I.D. [mprovements in the <br /> (ntersection to flow north. The drainage from the L.I.D. <br /> improvement will ilow south. <br /> S. The grade that you show for ground elevation whlch adjotn the L.1.D. <br /> Improvement do not match. Consult the Caslno Road design plans <br /> and check all grades and slopes. <br /> 6. Catch Basin A�2 (s per Ctty Standard �l4U4, 403 and 606. <br /> 7. Catch Bastn pl is in a very crltical locatfon. It must be relocated to <br /> a position and elevation that will have less lmpact on the City right- <br /> of-way. <br /> 8. Show the type of p(pe being used for storm dralnage on the slte and ln <br /> the right-ot-way. Concrete pipe must be used in the right-oi-way. <br /> 9. Inlet N7 is per Ctty Standards b401 and 405. <br /> 10. Show the aewer and water systems. Make the same correctton to <br /> sheEt 3 and 4. <br /> There are some scrious problems with the proposed storm detention system for <br /> th(s project. Possibly the in-Ileu of fee would be a better solution. Please <br /> contact Dan Mathias at 259-�811. <br /> Return mark-up with two (2) revised cop[es. <br /> Advise the Engineer's Estimate for the lnstallation of site util[ties excli�sive of bullding. <br /> Sincerely, <br /> ALFRED R. THEAL, P.E. <br /> Public Works 7(rector/City Englneer <br /> � <br /> � %- <br /> �� <br /> Dy:( .arr r ord <br /> Publ ervices Supervisor <br /> cw:jc► <br /> � <br /> l <br />