Laserfiche WebLink
K� <br /> Kegel & Associates Inc. <br /> April 21 , 1983 <br /> Messrs. Dan Mathius R Gordon Witcher <br /> City of Evere[t Deparlmenc of Vublic Works <br /> City Service Center <br /> 3200 Cedar Street <br /> Everett, Washingt:on 98201 <br /> Re: F.ngineering Construction Cost IssLimaCe -- Cosino Road Square <br /> Our Job No. 8604 <br /> Dear Sirs: <br /> 1n accordance with your new Ordinance No. 921-83, we have at[ached nn engineer's <br /> conatruction cost estimate for the Casino Raed Square pro�ject for your review. <br /> Upon review of your ordinance, we believe there are Lhree permits required for <br /> approval of the project. These nre ae follows: <br /> 1) Eroaion Control Plan (Commerciel/Industria]). . . . . . . . . . . . .. .$ 100.00 <br /> 21 Parking I.ot Paving $,005 (44,890.83). .. . . . . . . . . .. . . .. . . . . . .$ 224.45 <br /> 3) Water Line, Sanitery Sewer & Storm Sewer/Dreinage <br /> a) Plan Review .004 (29,257.00). . . . . . . .. . . . . .. .. . . . . .. . .$ 117.03 <br /> b) Inspection .025 (29,257.W). . . . . .. . . . . .. .... . . .. . . . . .$ 731.43 <br /> TOTAL $1ll2.9i <br /> 7t is our unders[anding that only the Eroaion Control Plan fees and [he Plen <br /> Review porCion of the Water, Sanitary Sewer & Drainagc Plan fees ($100,00 + <br /> $117,03 @ $237.03) be paid [o obtain plan epproval. The remaining tees need be <br /> peid at the time t.he permiCs are issued, <br /> Please verify these figures, <br /> Reapectfully submitted, <br /> ��R <br /> R. Michael Speno, P. '. <br /> Kegel & Associates, Inc. <br /> � � <br /> .� �J� c <br /> ENGINEERS • SURVEYORS • PLANNCRS �. <br /> 9800 EVEFCREEN WAV IU.S. 991, EVERETT,WASHINGTON 98204 • PHOIVE (206) 353�1118/775�F4Y4 <br /> I <br /> I <br />