My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
205 E CASINO RD INJURY ADVOCATES 2016-01-01 MF Import
>
Address Records
>
E CASINO RD
>
205
>
INJURY ADVOCATES
>
205 E CASINO RD INJURY ADVOCATES 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 11:29:04 PM
Creation date
1/24/2017 11:28:53 PM
Metadata
Fields
Template:
Address Document
Street Name
E CASINO RD
Street Number
205
Tenant Name
INJURY ADVOCATES
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pueuc woit�rs <br /> November 26, 2012 <br /> Jose Bravo <br /> Bravoja33@gmail.com <br /> RE: Owner: Toikka, Marie <br /> ]ob Address: 205�ti Casino Rd <br /> Plan Check No: 61211-019 <br /> Dear Mr. Bravo: <br /> In response to your application for a construction permit, your plans have been examined and <br /> you are advised tha! revisions may be necessary before a permit can be issued. Please review <br /> an respond to the comments below. These comments address building issues only. Additional <br /> revisions, or additions, may be required by other departments (such as Utilities, Planning or <br /> Fire). All references refer to the 2009 International Building Code (IBC), the 2009 International <br /> Fire Code (IFC), the 2009 Internationai Mechanical Code (IMC), the 2009 Washfngton State <br /> Energy Code (WSEC), as amended by the State of Washington and adopted by the City of <br /> Everett. The current IBC referenced standard for accessible design fs the 2003 Accessible and <br /> Usable Buildings and Facilities A117.1-2003 (ICC/ANSI). Federal ADA regulations and standards <br /> may be more restrictive. <br /> In order for the processing of your applicatfon to conHnue, it will be necessary to <br /> provide the Building Division with two complete new sets of construction <br /> documents reflecting the corrections requested. <br /> 1. ANSI Ai17.1, Section 404.2.3 requires an 18" maneuverabili.ry clearance at the latch <br /> side of doors for front approach on the pull side. This occurs at the door into office #6 <br /> and the door into the hall. <br /> 2. The plans should including bracing at the top of the new walls other than the ceflings <br /> grid. <br /> If you have any questions, please call me at 425-257-7264. <br /> Please prepare a response letter showing where each item in this correction letter is addressed <br /> on the plan set, <br /> Upon resubmittal of the drewings, your application will be given priority and plan review will <br /> recommence. <br /> All required submittals shall be of sufficient detail and contain sufficient information to ensure <br /> that the proposed structure will be constructed in compliance with all adopted codes. <br /> � <br /> Sincerely, � rl j • <br /> I � � � � <br /> � ' <br /> Steve Miller <br /> Associate Engineer <br /> CITY OF EVERETT • 3200 Cedar Slreel � Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8882 <br /> . ��,,,,,,.,,,����.,.�.����., .����,n,,,,��.,�..,..,�„ <br />
The URL can be used to link to this page
Your browser does not support the video tag.