My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
521 E CASINO RD 2016-01-01 MF Import
>
Address Records
>
E CASINO RD
>
521
>
521 E CASINO RD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2017 12:51:05 AM
Creation date
1/25/2017 12:50:36 AM
Metadata
Fields
Template:
Address Document
Street Name
E CASINO RD
Street Number
521
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' { � f <br /> 3. Verizon Northwest has facilities near ihis location. However, any building entrances must be <br /> swordinated at least 60 days in advance. The cost of any relocalion of Verizon facilitfes that <br /> is required to construcl the new apaAments viill be at the tolal expense of lhe deveioper. Any <br /> relocation will take 60 to 120 days. Please contact Mike Hupf, Engineer al(425)356-4052 or <br /> Mike Bly, Engineer at (425)356-4034 if you have any questions regarding this building <br /> entrance. <br /> 4. Verizon NoAhwest will provide service to lhe site. However, new telephone cabin <br /> construction will be required in conjunction with lhe :�ite developm�nt. Verizon's engi.ieering <br /> will begin when lhey are nolified of your construcUon schedules and lelephone requirements. <br /> 5. Il will be the developer's responsib'.lity to provide a suitable combination of a�nduit and <br /> trenching and/or riser conduit lo accommodate Veiizon's network comrnunications cable <br /> wilhin the complex. Provided that an acceplable combinaQon of amduft and/or trenching is <br /> incorporaled into the project lo accommodale Verizon's entrance rable, there will be no costs <br /> to lhe developer for Verizon's cable. <br /> 6. It a reaRangement o(existing cables on premises or on lhe right��f-way is necessary, <br /> appropriate charges will be estimated and Verizun's Guaranty of Paymenl form will be <br /> ;oiwarded to you for your signature. Prior to commencemenl of Verizon's engineering fcr <br /> such rearrangement, a deposit will be requfred. To insure timely telephone service, Verizon <br /> requesls ninety(90)days lead time for engineering, procurement, and installation o`cable <br /> and/or Verizon's equfpment. <br /> Please contact �.Aichael Hupf, Engineer, at(425)356-4052 or Mike Bly, Engineer at (425)356- <br /> 4034 should you require addilional intormation. <br /> S:1FSIddp1WINWORD�SEPAlsepa05�045 Caswde Courl.doc <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.