Laserfiche WebLink
FINAL DECLARATION OF NON -SIGNIFICANCE <br />Description of Proposal <br />i "tETi <br />The proposed action is the issuance of building permits to allow the construction of a 14,600 <br />The rfollowing sfactors remodel Yere considered mand tthe tolisteddconditions ing and r placed n response ntto <br />comments received froir City Departments during their review of an En ,ironmental Checklist <br />for this proposal: nt showing <br />ted to <br />le <br />ic Works <br />I tme <br />parkinglayout,landscaping, driveways, utiliitiesuslorm drainage, <br />kingand all required <br />improvements to the public right-of-way. Public Works Department approval of <br />these drawings <br />is required <br />before any per is permits <br />siare issued. All improvements shall <br />be completed <br />As-builts, easement, and a one year Warrantee Bond in the amount of 1090 of the <br />cost of construction of the -public water vstem are required within 10 working <br />days of obtaining public water connection. <br />2. City streets are to be kept clear of dirt and debris during construction. <br />and from the site <br />thin the City Of <br />3 During , Everett shall be onotn arterial rstreets unuck cle soother wise approved bytthe Public Works <br />Department. <br />? determined by water use data to be generated prior <br />4. Sewer connection fee will be <br />to building permit applicatio,t. <br />ation control <br />erosion <br />5 plan mustbeapproved <br />On -site detention <br />ttrbyuthe Public Works Department t Departmensbefore ntany clearing, <br />other site preparation can begin. Drainage calculations to be <br />grading, Ian submission form. Reseedingxposed earth is <br />submitted on City Drainage P <br />required within 30 days of completion of earth work. <br />6. A preconstruction conference on Civil Engineering portion of project is required <br />prior to approval Public <br />Works Permit. <br />dent, contra cor, all ssubcontracctors, Fire <br />arrange meeting <br />involving applicant, job super nt <br />PublicaWorrks Coorrd nator, Public Works nInspector, Iand City ding pCoordinator, <br />Traffic Engineer. <br />7. Gate to remain at service road access to Evergreen Way. <br />S. Concrete driveway aprons to be provided at existing entrances. <br />9. Drainage facilities must be developed to transfer storm water to existing systems <br />by approved means. <br />e a <br />ve <br />oot wide <br />10. planting areaas <br />along t'the entireestreet et hfrontage exceptrfor ddrivewti Parking aredriveways, per City <br />Code. <br />hat a <br />ive <br />nt of tharking <br />rea be <br />II .plantedtand land capedtminimum <br />The Ciy recommendsto breakup visually ftile largeeexpanses of barren asphalt <br />sphlt <br />and to provide necessary traffic separation within the parking lot. <br />12 installation of a hydrant twill be required not c0loser than 50 feet to any structure. <br />