My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
801 E CASINO RD 2018-01-02 MF Import
>
Address Records
>
E CASINO RD
>
801
>
801 E CASINO RD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2022 12:57:47 PM
Creation date
1/25/2017 2:08:54 AM
Metadata
Fields
Template:
Address Document
Street Name
E CASINO RD
Street Number
801
Notes
PORTABLES
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1678
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I . The facility would better serve the ntudentn of Cascade High School by 7 <br />providing additional permanent clann room area. <br />I <br />i 2. The expanding recreation fncilitics will. help mLet the conrnunity <br />recreational needs by being available to them in off -hours. <br />3. This action has been determined to have a non -significant impact <br />upon the environment and an Environmental Impact Statement is not <br />required under RCW 43.21C.030 (2)(6). <br />NOW, THEREFORE, BE IT RESOLVED BY THE PLANNING COMMISSION TO THE <br />EVERETT CITY COUNCIL, that the Special Property Use Permit be granted to the <br />Everett School District 02 for the expansion of the Physical Education <br />Building, Graphics Arts, Electronics, Carpentry, Power Mechanics, and Auto <br />1 <br />I <br />Technical facilities with the existing tennis courts being resurfaced and <br />lighted as a portion of this expansion plan; all to be contained within the <br />{ existing campus at 801 Casino Road, with the following conditions: <br />1. That the facility be constructed according to the drawings and site <br />plan submitted. <br />2. That any major deviations from the approved site plans shall be <br />submitted for review by the Planning Commission and City Council <br />Prior to construction. i <br />3. A storm water detertion facility must be designed in accordance with <br />the City of Everett Drainage Ordinance. <br />Mi a Faulkner, Chairman <br />Everett Planning Commission <br />APPROVE: <br />b FOR 0 AGAINST 1 ABSENT-,) ABSTAIN <br />IL <br />Peter B. Grodt, Secretary <br />Dater <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.