Laserfiche WebLink
�� SPROUT ENG/NEERS & ASSOC/ATES /NC. N;��,,,W.A,a��.P.E. <br /> CONSULTING ENGINEERS ea�sie o,erra,r.e. <br /> � loe W.4owar0�P.E. <br /> � 24645 PACIFIC HIGHWAV 50.,VALIqNT PIAZA, NENT, WRSH.98031 839�6510 1206) Marry A.Ericson.L.S. <br /> Sleve Argyris,COmpt. <br /> RENO.NEVADA SEATTLE.WASHINGTON <br /> February 24 , 1970 <br /> WA-3013-SN <br /> /01_O � ��'�-� �r � <br /> City of Everett <br /> City Hall <br /> Everett, Washington <br /> Attention: Mr. Frank T. Woltring <br /> Building Inspector <br /> Subject: 149 Unit Apartment at <br /> lOth & Casino <br /> Gentlemen: <br /> Enclosed are our inspection reports covering the <br /> concrete slab and footings of building #1. <br /> Most of the concrete for bu.ilding ql had been <br /> poured before Sprout Engineers was authorized to inspect <br /> the concrete thickness and steel placement. For this <br /> reason, Sprout Engineers ' inspection and responsibility <br /> for inspection is limited to the east 122-feet of <br /> b�ii.lding #1. <br /> Concrete samples were taken from the last three (3) <br /> truckloads of concrete. Concrete strength data of these <br /> samples has not been determined as of this date. <br /> Should you have any questions on the above job, <br /> please call. <br /> Very tr.uly yours, <br /> IJ�.C�ca.n-uS-�u.�iac ,�l�i`�' <br /> William Shupe Holmberg, P.E. <br /> Inspect:or <br /> WSH/je ! <br /> Enclosure <br /> dVILENGINECRING PUBLICIMPROVEMENTS PHOTOGRAMMETPY FOUNDATION ENG�NEERING ENGINEERINGNEPOPTS MATERIALSTESTING <br />