Laserfiche WebLink
~ C� ODDS ENGINEERS, INC. <br /> ��'� _ <br /> C I V I L E N G I N E E R I N G S U H V F Y I N G P L A N N I N G <br /> January li, 1990 �/ ,� <br /> DEI Project No. 89094 ��/ <br /> Mr. Gordon Witcher <br /> City of Everett <br /> Department of Public Worka <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> Subject: Casino Road Apartments <br /> Dear Gordon: <br /> I have enclosed the revised plans for the above-referenced project. <br /> Moat of the reviaions were minor. Subse�uent to our conversation <br /> regarding the fack that Centron' s offsite utilitiea are not in place, <br /> I relayed the options we discussed to C.P.C. Their decisiona are <br /> summarized below for your information and concurrence: <br /> HiLlf <br /> As we understand it, the requirement for a looped water syatem ia for <br /> purification reasons rather than for fire protection. As a result, <br /> we understanc.i the buildinq permit for thia property may be isBlip.d <br /> without the loopad system, provided that prior to receiving the cer- <br /> tificate of occupancy a looped system must be in place and accepted <br /> by the city. <br /> In the event Centron is installing their utilities at the same time <br /> as C.P.C. , C.P.C. will construct the water line from Casino Road to <br /> the tee in Cherry Way and its on-site system. C.P.C. will install a <br /> temporary plug at this tee and then build the remaining loop when <br /> Centron has provided its stub. This will allow C.P.C. to continue <br /> construction and give Centron every chance to install its utilities <br /> so C.P.C. may connect as designed. <br /> If C.P.C. ' s scheduling is such that they can not wait for Centron, <br /> they would then prupose an alternative design. The design would show <br /> an 8" line running northerly from the on-site fire hydrant to connect <br /> to the 16" line in Casino Road. The two connectiona would be approxi- <br /> mately 63' apart. <br /> At this time it is rather difficult to predict Centron's timing. Be- i <br /> cause the alternative is uncomplicated, easy to prepare, and will ob- <br /> viously satisfy the city' s requir.ements, we propose to delay making <br /> this deaign change until it becomes clear that it will be necessary. <br /> 4205 14BTi i m�l N ! . .��. n 1 C 'r_ili 7- BBLLE VUE. WA 98007 �2061 �85-7877 17R 454-:3743 <br /> ��1x:�206�8�5-7fB�3 <br /> I <br /> t <br />