Laserfiche WebLink
� ♦ �_ <br /> � <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect sfde sewer per Ciry Standard q601. ��� <br /> � Connect side sewer per Ciry Standard 1►'s 601, 602, 604. ' <br /> ee S 4' <br /> i <br /> 7. Connect ell ruoftop downspouts to the side sewer. � <br /> 8. Connect rooftop downspouts to the drainage system provided for this lot. /�� � <br /> �Rooftop runoff must be discharged to a roof downspout infiltration system per Ciry of Everett <br /> �•� Storm Manual 3-2.62. Width�, Depth �!5', Length�'. l o si,�o <br /> 10. The contractor must meet with the PubUc Works Inspector to dfscuss potential drainage <br /> routing prior to beginning the project. <br /> 11. Install erosion control measures es determ(ned by the Public Works inspector, such as silt <br /> fence, straw beles, swales, or erosion blenkets. <br /> <2�.Install erosion control measures per Ciry of Everott Standards for small parcels <br /> ,1 <br /> 13. Remove erosfon control measures upon completlon of the project prior to final approval of the <br /> � permit. <br /> �All excavated materiel from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material �s allowed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Stendard Plan 11's 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector(I.e. all unused <br /> driveways and any broken or damaged area mu�t be replaced). <br /> 16. Install a Type I concrete drivewey per City of Everett Standerd k307. <br /> 17. Pavo driveway from the front property Iine out tc the street paving. <br /> 18. Contact the Water District for connect(ng provisians for this building's <br /> water and sewer services. <br /> 19. A catch besin as per Ciry Stendard Plan #402 witli a gas trao per Standard Plen M410 is <br /> required for the parking area. <br /> 20. If a sewer pump system �s to be installed, the pressw e line must discharge into a privete <br /> manhole, then gravity tlow across the public right-of-�iay. <br /> 21. A sprinkler system is required for this building in cc�i�ipliance with the requirements of NFDA <br /> Standards 13D. <br /> � 815 !^� C'.�v�;�o <br /> PWCamments <br />