My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1910 W CASINO RD 2018-01-01 MF Import
>
Address Records
>
W CASINO RD
>
1910
>
1910 W CASINO RD 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2019 11:29:18 AM
Creation date
1/25/2017 7:08:54 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
1910
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. A two-year quarantee is reruired for private retention/detention <br /> or other draineqe treatment/abatement facilities serving areas <br /> larqer then one acre. <br /> 5. On-aite wetermain will be staked within an easement to the City. <br /> The easement will be eubmitted to the City prior to the issuance <br /> of permits. <br /> 8. As-builts of storm sewer, sanitary sewer, and water syRteme will <br /> be required to be submitted per City desiqn and construction <br /> atendnrds and speciPications. <br /> 9. The Police Department has the followinq security recommendations: <br /> a. The perimeter doors should be eolid core with 190 degree to <br /> 220 degree wide angle viewers and single cylinder deadbolts <br /> with 1^ throw and at lenst 3^ screws securinq etriker <br /> plate. <br /> b. Bey windows should overlook the parkinq lot Por increesed <br /> security of vehiclea. <br /> c. sliding glase doora should have Cherlie bars installed for <br /> optimum security. <br /> d. Liqhtinq oP the parking lot should be a minimum of 1-2 foot <br /> candles. <br /> e. During the final staqes of construction, pleese contect Dick <br /> Thornberry, Crime Preveniion OfPicer at 259-0416 for further <br /> sacurity recommendetions. <br /> 10. GTE Northwest hes facilities at thie location. Any building <br /> entrances must be coordinated at least 60 daye in edvence. <br /> The cost of any relocation of GTE facilitiea that is required to <br /> conatruct the new complex will be at the totel expense of the <br /> developer. Any relocation will take sixty (60) to one hundred <br /> and twenty (120) days. Your contact at GTE Northwest is Michael <br /> Hupf at 356-4052 for this building entrance. <br /> 11. snohomish County Public Utility Dietrict No. 1 hes sufPiciont <br /> capecity to serve this development. For information about the <br /> electrical service requirements for this project, contect Swede <br /> Johnson of the District�s Customer Enqineering OlPice, Everett, <br /> nt 258-8289. <br /> 12. Premises muet be clenrly identified by address at the street <br /> entry. Each building must be clearly identified so as to be <br /> visible end legible from the access road. Each apartment must <br /> be clearly identified so e�s to be visible and legible from the <br /> access road. <br /> 13. A portable fire extinguisher with a minimum UL rating of 2A must <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.