Laserfiche WebLink
. i <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> G. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> 8. ' Connect rooftop downspouts to the drainage system provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> Slorm Man��al 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See <br /> attachment for more details. <br /> 10. The contractor must meel with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning lhe project. <br /> 11. Install erosion control measures as determined by the Public Works inspector, such as sill <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. �! Install erosion control measures per City of Everett Standards for small parcels <br /> � 13. / Remove erosion control measures upon completion of the project prior to final approval oi the <br /> permit. <br /> 14. All excavated material from (oundation, sidewalk and driveways shall be hauled to an <br /> apprcved, permitted sile. No wasting of material is allowed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on ihis proposal's frontage as directed by the Public Works Inspector (;.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Instali a Type I concrete driveway per City o( Everett Slandard #307. <br /> 17. Pave driveway from the front property line out to the street paving. <br /> 18. Contact the Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin �s per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required (or the parkmg area <br /> 20 If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 21 A sprinkler system is required (or this building in compliance with the requiremenls of NFDA <br /> Standards 13D. <br /> �r, .:�mE��s z�L <br />