Laserfiche WebLink
IVI�� � f�SSQ��I� IES - PHONE (206� 6A1•2BD6 <br /> E�N�tNE�,1t11��G.-� : : �.-�: �l <br /> SURYEYING �268 W. LK. SAMM. PKWY. N.E., 6ELLEVUE, WA. 9BOOH <br /> �4ay 17, 1979 <br /> City of Everett �FC���;;a <br /> Engineering Department � <br /> City Service Center �wQ���,_ <br /> 3200 Cedar 5treet <br /> Everett, WA 98201 <br /> Attn: Ms. Celia Strong � j 1 � <br /> Re: Williver Building �- �� <br /> Dear Celia: <br /> ' �(y client intends to construct a manufacturing building on a parcel he awns on Casino <br /> Road. (i discussed this project with you about a month ago.) We have made applica- <br /> tion for a short plat of this property. When this is approved, an application for a <br /> building permit wi11 be made on Lot 1 of this short p1at. <br /> In order to establish a budget, the owner needs to know what his Casino highway charg <br /> will be. 'dhen I talked with you before, you indicated that you needed to know the <br /> number of employees. I phoned this information to your department some time ago. It <br /> will be six people. <br /> The lot area will be 9,304 sq. ft. less the 10 ft. x 124.40 ft. to be decllcated = <br /> 8,060 sq. ft. The frontage will be 124.40 ft. The building to be constructed will <br /> be 5,100 sq. ft. (According to my calculations, thP required numhar of parking place <br /> is 1 per 800 sq. ft. per Zoning Code 19.40 or 5,100 divided b•• S00 = 64 or 7 places.) <br /> These are my cumputa*tons for the interim improvement costs. A cash deposit of which <br /> ever of these costs is greater: <br /> (1) 390/trip times 2 trips/day times 1 parking places = 31,2G0 <br /> (2) 43,560 sq. ft./acre divided by 1500 sq. ft./unit (R-3) = 29 units/acre. <br /> I 29 units/acre times 5583/unit times 8060 sq. ft. divided by 43,560 sq. ft./ <br /> acre = $3,129.34 <br /> or Payment guarantee of 29 units/acre times 56b7/unit times C060 sq. ft. <br /> divided by 43,560 = 53,606.40 <br /> Celia, could you please drop me a note indicating what these char•9es would b�1 Pleas <br /> also indicate when these charges must be paicl in the buildi�g per�nit process, <br /> S�cerely you�� <br /> ,�i.0 r�-�{ � <br /> Michael H. Yuhl , .E. <br /> cc: Mr. �ranl: Williver <br />