My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2208 W CASINO RD 2018-01-01 MF Import
>
Address Records
>
W CASINO RD
>
2208
>
2208 W CASINO RD 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2019 12:06:11 PM
Creation date
1/25/2017 8:19:16 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
2208
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAR-20-2009 FRI 08;48 AM FAX N0, P. 02 <br /> Nlarch 11, 2ooe Earth Sofutions NW LLC <br /> (tevised March 17, 2009 <br /> CS-0692.03 •Geotechnir.il Engineering <br /> �Corutrudion Mcmitorii g <br /> •@nwronmenlal Sc�ienca <br /> Panattoni Conetr,�ction <br /> 6840 Fort Dent Way, Suite 350 <br /> Seattle, Washington 98188 <br /> Attentlon: Mr. Ben Brodsky <br /> Subjecr SatHomont Repalr Summary <br /> Cesino Road Corporats Park <br /> Everott, Waehington <br /> Dear Mr. Brodsky: <br /> In accordance with your request, Earth Soiutions NW, LLC (ESNVV) has prepared this letter <br /> providing a summary of the remedial moasures takon to edd�ss sattlement that occurred to the <br /> building and aurroundinp area located et 2206 West Cesino Road. A representative of ESNW <br /> was on•site on November 24-25 and December 11-12 to obaerve repafrs made at the northeast <br /> corner of the bullding and the adjacent access road. The subject development consists of a <br /> single-story warehouse building constructad utilizing continuous spread footines and t11t-up <br /> panels. <br /> ESNW was notified on October 6, 2008 of settlement that occurred at the northeast corner of <br /> t7�e building. The observed slgns of settlament included fractures and spallinp of tho eastom <br /> and northom t11t-up panels at the panel connaCUon po(nts. The fractures and spalling wore <br /> associated wlth the down sat of the footing at the northeast comer of the building, In addition to <br /> sottlement in the building, lension cracke and fracturing of tha cement troated soil in the access <br /> road immediately adjacent to the building at the northeast comer were also observed. <br /> On Octobar 17, 2008, a represontative of �SNW obsorved three borings drilled adjacent to the <br /> area of the building affected by settlement. Two of the borings were located within two to three <br /> feet of the footing and one boring was located approximately ten to twelve feet from the fooUng, <br /> The borings noarest lhe footing encountered a zone of very loose fill at depths of approxlmately <br /> fivo to nine foot bolow the ground suriace. <br /> Bulldina Footina 3011 Reoair <br /> The repair of thc� footing subgrado was achioved through the employment af Uretek synthetic <br /> polyurethane inJection. This work was performed by a contractor who specfalizes fn <br /> polyurethane inJection. <br /> 20tf1 152nd qwnur. NC • Redrnond,WA 9D052 •(A75)?P4•730U• FA%1425;7044855 � Tull Free�8661 336-8�10 �/3 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.