Laserfiche WebLink
( ( . <br /> 26. The Police Department hes the followinq security <br /> recommendations: <br /> a. Lightinq of the parking lot ahould be n mini�um of 1-2 foot <br /> candles. <br /> b. Oulring the final steges of construction, plaase contect Dick <br /> Tharnberry, Crise Prevention Officer et 259-0416 Por lur+:her <br /> security racos�endetions. <br /> c. A 'onitored fire and ietrusion alars system zoned for <br /> antity should ba provided. To provids prote�tion 1n cena oP a <br /> robbery, includa ramote ��anic buttons and/or foot tri,p if u <br /> custoaer counter. <br /> d. If offiaas will be hnndlinq caeh, an actuaseismicydetectors <br /> be instelled (!or next dny receipts only) . <br /> pessive inlrared nlers sensore ehould elso be installed in tha r <br /> e. The parieeter doors should be eolid core or et+tel <br /> double cylinder dasd-bolts installad. IP doors open to th�a outs <br /> or hinqas are exposed, pin hinge6 should be provided. <br /> f. if stora Pront gless doore are part o! the project, they sh <br /> have lxking cese bolts top and bottom. The door shoul.d he <br /> eeximum security deadbolt with 1-�/4" throW and ]/4" lamin <br /> steel. <br /> q. Metel security bay doors cnn be secureCl <br /> 7/e" cnse-hardened steel hasps or chein end padlocks with <br /> case-herdened steel shackles. <br /> h. The more office windowe that are visible to the parkinq e <br /> the sefer the aree is from esseults end thefts. <br /> 27. For outeide storage arees, there should be an e foot <br /> eite-obecurinq fence surrounded by e ten foot wide landeceped aree <br /> plentaQ to Typ�s II standarda. <br /> 28. The proposed development is in an aree vhere the Snohomish <br /> County PUD is currently upgrading the electrical system. <br /> Service to the development is expected in a timely mnnner. For <br /> informntion about the electrical service requirements for this <br /> project, pleese cell Swede Johnson nt the District's Cuatomer <br /> Engineerinq Office, Everett nt 258-8289. <br /> ` 29. The site plan submitted for buildinq parmits shnll continue to <br /> show e sidewelk from the buildinq to Cesino Rd. so thet oleer, <br /> snfa, well-lit access ta mnse transit services can be provl.ded. <br /> 30. For any proposed chanqe 3n use fron warehouse to n use more <br /> intense, additional administretive and environmentnl revi�3w �s <br /> 7 <br />